Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.
1.1Metered energy by route
What ifWhat if the controller obtains trip energy from a route lookup table without calculating the distance to the destination?
Claim language“calculates an operation distance”
A battery energy meter integrates net discharge in kilowatt-hours on completed trips. The controller retrieves a high-percentile energy value using the assigned route and departure terminal as table keys, then adds a battery reserve.
1.2Motor torque and shaft speed
What ifWhat if the controller estimates traction energy from motor torque and shaft speed without acquiring an average vehicle speed?
Claim language“an average operation speed”
The controller multiplies recorded shaft torque by angular speed at each sample to obtain mechanical power. It applies motor and inverter efficiency maps, then integrates battery power over the recorded duty cycle to estimate net traction energy.
1.3Traffic correction from acceleration counts
What ifWhat if the controller uses a count of expected stop-and-go accelerations without predicting congestion time?
Claim language“a predicted congestion time”
A traffic processor estimates the number of additional acceleration events from recent vehicle traces on the scheduled route. The charging controller multiplies the count by a calibrated net energy cost per event that includes energy recovered during braking.
1.4Metered energy at passenger stops
What ifWhat if the controller estimates passenger-stop energy directly from metered history without predicting boarding and alighting time?
Claim language“a predicted boarding and alighting time”
A door controller flags passenger-service events while a separate meter accumulates energy drawn by auxiliary circuits during each event. The charging controller sums stored kilowatt-hour allowances for the scheduled stops using the stop identifier and outdoor temperature band.
1.5Charge termination by accumulated energy
What ifWhat if the charger ends the session at an energy threshold without calculating the required charging time?
Claim language“calculates a charging time”
The charger integrates pack voltage multiplied by charging current to measure the energy delivered at the battery terminals. It stops current when the accumulated energy reaches the authorized increment or the battery controller reports a voltage or temperature limit.
Section 2 · machine-generated
Variations
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
Other field of use
Underground mine personnel shuttle charging
A battery electric personnel shuttle follows a fixed route between an underground refuge station and a shaft landing. Its controller sums the lengths of the tunnel segments to the destination and multiplies the distance by a reference energy use per kilometer. The controller corrects that estimate using average travel speed and predicted waiting times at single-lane sections and boarding bays. At the shaft landing, a grid-fed charger stops at the battery state of charge calculated from the corrected energy requirement and a configured reserve.
Component substitution
Track transponders for remaining distance
Passive radio-frequency identification transponders replace satellite positioning as the position input to the distance calculation unit on a fixed-guideway shuttle. Each transponder marks a surveyed point, and an underbody reader uses its identifier to retrieve the distance along the guideway from a stored table. Between transponders, the controller adds travel measured by a wheel encoder and subtracts the resulting position from the destination position. The controller converts the remaining distance to a reference energy requirement, corrects it using predicted stop dwell, and sends the resulting state-of-charge target to a grid-fed charger.
Parameter or scale variation
Eight minute terminus charging window
A fixed-route shuttle with 120 kWh of usable battery capacity starts an 18 km leg from a terminus fitted with a 150 kW grid-fed charger. At a reference consumption of 1.0 kWh per kilometer, the controller starts with 18 kWh and adds 2 kWh for predicted auxiliary demand during boarding and traffic delays. It adds a 12 kWh arrival reserve and sets the departure target to 26.7 percent of usable capacity. If the battery contains 16 kWh at plug-in, the controller calculates that the required 16 kWh takes 8 minutes at an average net battery charging power of 120 kW and stops charging at the target.
Combination with existing systems
Depot charging under a demand limit
A depot energy management system connects a facility power meter to the charger for a fixed-route vehicle. The vehicle controller sends its route-based state-of-charge target, current state of charge, and scheduled departure time to the depot system. The depot system subtracts measured building demand from the configured site power limit and uses the available power to calculate the remaining charging time. It updates the charger power as building demand changes and stops charging when the vehicle reaches its target.
Automated or data-driven variant
Passenger counts for stop dwell prediction
Overhead depth sensors at the vehicle doors count passengers entering and leaving, while door switches record the start and end of each stop dwell interval. The controller fits a linear regression model to recorded dwell times using boarding counts, alighting counts, and the number of doors in service. At the charger, it uses historical passenger counts for the upcoming stops at the scheduled time to predict total boarding and alighting time. The controller multiplies that time by estimated auxiliary power, adds the result to the distance-based energy requirement, and converts the total to a charging target.
Congestion prediction from segment travel times
The vehicle controller divides its fixed route into road segments and stores a free-flow travel time for each segment. It obtains current segment travel-time estimates from a traffic data feed and sums the positive differences from the stored times to predict congestion delay. It also divides route distance by the sum of estimated segment travel times to obtain average operating speed while on the road. The controller uses that speed to correct distance-based traction energy, adds auxiliary energy for the predicted delay, and commands a grid-fed charger to stop at the calculated state of charge.
Specific version of a part
Distance from route segments
A route table stores the length of each road segment in meters. The distance calculation unit adds the remaining length of the current segment to the lengths of the downstream segments that lead to the destination.
Average speed from wheel pulses
A speed acquisition unit converts wheel rotation pulses to traveled distance using the calibrated rolling circumference of the tire. It divides the accumulated distance by the elapsed operating time between departure and arrival timestamps.
Charge time from current limits
The calculation unit splits the interval between the initial and target states of charge into one-percentage-point bands. For each band, it divides the required ampere-hours by the permitted current at the measured pack temperature, then sums the band durations.
Grid charging to target percentage
The vehicle controller converts the required energy increment to a target state of charge using a stored table that relates usable pack energy to state of charge. A grid-fed charger supplies direct current and ramps it to zero when the battery controller reports that the target has been reached.
Section 3 · quoted from USPTO records
Other work
Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.
1.1a distance calculation unit that calculates an operation distance to a destination of the moving body;
The position of the vehicle may be recognized by a simultaneous localization and mapping (SLAM). “The vehicle approaches the destination” means, for example, that the vehicle reaches a point of a predetermined distance to the destination on the route toward the destination. “The vehicle approaches the destination” may mean that the vehicle reaches a point of a predetermined time before the arrival at the destination.
A · US 2019/0113357 A1 · ¶ 25
1.2a speed acquisition unit that acquires an average operation speed of the moving body;
The autonomous driving ECU 3 generates a travel plan along a target route to the destination set in advance based on information on a position of the vehicle measured by a vehicle-mounted global positioning system (GPS) receiver, the map information in the map database, an environment around the vehicle (a position of another vehicle, and the like) recognized from the result of measurement performed by the vehicle-mounted cameras and radar sensors (millimeter wave radar and L
A · US 2019/0113357 A1 · ¶ 23
1.3a congestion time acquisition unit that acquires a predicted congestion time;
The communication unit 2 acquires information on the surroundings situation at the destination via the wireless network. The information on the surroundings situation may include detailed map information, traffic information (a traffic regulation, a congestion situation, a vacancy situation of the parking lot, information on street parking, and the like), image and moving picture information around the destination.
A · US 2019/0113357 A1 · ¶ 21
1.4a boarding and alighting time acquisition unit that acquires a predicted boarding and alighting time; and
1.5a charging time calculation unit that calculates a charging time required to charge the storage battery,
1.6wherein a reference charging amount is calculated based on the operation distance, the reference charging amount is corrected based on at least one of the average operation speed, the congestion time, the boarding and alighting time, and the charging time to calculate a required charging amount, and
1.7a state of charge of the storage battery is calculated based on the required charging amount, and control is performed such that the storage battery is charged to the state of charge from a stationary power storage device or a grid.
The charging station 10 has a power/voltage converter 50 that is supplied with AC voltage from a public electrical energy grid 12 and that has galvanic isolation 54. The power/voltage converter 50 feeds electrical high-voltage DC current charging power to a pair of two charging lines L1, L2.
B · US 2021/0138923 A1 · ¶ 22
An empty cell means only that no passage was reproduced there.
Statements in these documents
Therefore, in the present technical field, it is desirable to provide an alighting position setting device and an autonomous driving system that can set an alighting position reflecting the occupant's desire.
A · US 2019/0113357 A1 · ¶ 4
Therefore, this device can set the alighting position reflecting an occupant's desire.
A · US 2019/0113357 A1 · ¶ 6
Under some usage conditions, there may in this case be faults that may in particular interfere with the communication between the charging station and the connected motor vehicle.
B · US 2021/0138923 A1 · ¶ 6
It would therefore be desirable to provide a traction battery charging station having an insulation monitor by way of which electrical faults between the charging station and the motor vehicle are avoided.
B · US 2021/0138923 A1 · ¶ 7
Cite aspatent.fyi, US 2026/0356242 A1, claim 1, first published 2026-11-19T22:39:24-05:00, https://patent.fyi/US20260356242/, SHA-256 e9e07650effef6e6db9c39d3ac70e67f4a65d38180a4cffab59f9c65d4015351