patent.fyi
Applications  /  US 2026/0356247
United States Patent Application Publication

US 2026/0356247 A1

Published
Nov 12, 2026
Filed
May 4, 2026
Earliest date on the face
May 12, 2025
Classification
B60L 58/40
First published here
Nov 19, 2026

Generated automatically. Not reviewed by a person. Not legal advice or an opinion.

Section 1 · machine-generated

What if?

Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.

1.2Engine driven electrical generation

What ifWhat if a combustion engine and generator supplied onboard electrical power?
Claim language“a fuel cell”

The engine drives a generator whose rectifier feeds the traction DC bus. The power controller sets engine torque and generator current to meet traction demand and the storage device's charging target.

1.5Hardwired control logic

What ifWhat if fixed logic circuits implemented the charge and discharge control?
Claim language“computer-executable instructions stored in a memory”

Registers hold numeric route forecasts and storage measurements. Hardwired adders and comparators calculate the required charge margin, and a finite-state circuit sets the fuel cell current request as each route segment begins.

1.9Storage margin through load scheduling

What ifWhat if the controller created charge margin by shifting auxiliary demand while holding fuel cell output fixed?
Claim language“control an amount of the electric power generated”

Before the section begins, the controller advances scheduled cabin precooling and runs the electric compressor from the storage device. It limits precooling by the cabin temperature setpoint and ends the discharge when the storage energy reaches the entry target.

Section 2 · machine-generated

Variations

Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.

Component substitution

Supercapacitor storage with voltage based estimation

A supercapacitor bank replaces the traction battery and connects to the traction bus through a bidirectional buck-boost converter. The controller calculates available charge energy as one-half the bank capacitance multiplied by the difference between the squared upper voltage limit and the squared measured voltage. When the first braking segment is predicted to recover more energy than the intervening motoring segment consumes, the controller combines the two braking segments and the motoring segment in one energy forecast. Before the combined interval, it reduces fuel cell output and uses the bank for approach loads until the bank has room for the largest predicted cumulative energy gain, including converter losses.

Parameter or scale variation

Five segment energy planning for buses

A fuel cell bus with a 120 kWh battery groups three regenerative braking segments and two intervening motoring segments into one control interval when each of the first two braking segments recovers more predicted energy than the motoring segment immediately after it consumes. The controller updates its forecast once per second over the next 3 km and represents battery energy changes as positive during charging and negative during discharge. For predicted segment changes of +8, −3, +7, −4, and +6 kWh, the largest cumulative increase is 14 kWh. Before the first braking segment, the controller schedules fuel cell output and battery discharge to reserve at least 14 kWh below the battery's current charge ceiling.

Combination with existing systems

Battery thermal conditioning before regenerative braking

A liquid battery thermal management system connects a coolant pump, a heater, and a refrigerant chiller to the traction battery cold plates. When the controller groups two braking segments and the intervening motoring segment because predicted energy recovery in the first segment exceeds predicted motoring energy, it calculates both the required energy headroom and the peak charging power. It uses a battery charge acceptance map indexed by temperature and state of charge to select a pack temperature target for the interval. On the approach, it runs the heater or chiller as needed and includes their electrical demand when scheduling fuel cell output and battery discharge.

Automated or data-driven variant

Energy forecasts from repeated route measurements

A vehicle controller records route position, speed, estimated vehicle mass, and traction inverter power on each trip and assigns the samples to 50 m route intervals. A regression model predicts signed inverter energy for upcoming intervals using the recorded trips, current mass, and scheduled speed, and the controller converts those predictions to battery energy using charge and discharge efficiency maps. The controller merges a braking segment, a motoring segment, and a second braking segment when first-segment recovery exceeds the predicted motoring draw. It updates the predicted battery energy profile on the approach and adjusts fuel cell output to reserve headroom for the highest predicted energy within the merged interval.

Specific version of a part

Independent targets at segment boundaries

The controller forecasts braking energy for each charging segment independently and sets a storage entry target from that segment's forecast. During the intervening motoring segment, it adjusts fuel cell output and storage discharge to reach the second charging segment's entry target.

Hydrogen membrane fuel cell stack

A polymer electrolyte membrane separates the hydrogen anode from the air cathode in each cell. A compressor supplies filtered air, and a DC converter regulates stack current into the traction bus.

Liquid cooled lithium ion pack

Series-connected lithium iron phosphate cells accept current from the fuel cell converter and the traction inverter during braking. The battery controller uses cell voltage and temperature to set the allowable charge current.

Route segmentation by wheel power

The controller estimates wheel power along the planned route from road grade, target speed, vehicle mass, and rolling resistance. It identifies the three successive segments from a negative, positive, and negative sequence in predicted wheel power.

Entry target from peak energy

The controller integrates predicted net storage power through the combined section and uses the largest cumulative energy increase to set the required entry headroom. On the approach, it reduces fuel cell current so that traction demand draws the storage device down to the resulting energy target.

Section 3 · quoted from USPTO records

Other work

Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.

Document AUS 2011/0251770 A1
Published
Oct 13, 2011
Filed
Apr 8, 2010
Class
G06F 19/00
Document BUS 9,815,373 B2
Published
Nov 14, 2017
Filed
Feb 23, 2015
Class
B60L 1/003
Claim 1
Document A
Document B
1.1the vehicle including:
FIG. 1 is a functional block diagram of a braking system for a vehicle, such as a hybrid electric vehicle, fuel cell, or electric vehicle applications, in accordance with an exemplary embodiment; and
A · US 2011/0251770 A1 · ¶ 9
A hybrid-electric vehicle includes a traction battery constructed of multiple battery cells in series and/or parallel.
B · US 9,815,373 B2 · ¶ 2
1.2a fuel cell system including a fuel cell configured to generate electric power by using an oxygen-containing gas and a fuel gas;
1.3a motor generator driven by electric power that is generated by the fuel cell system, the motor generator being configured to consume motoring electric power; and
In a preferred embodiment, the energy storage system 107 comprises a hybrid fraction energy storage system for the regenerative braking components 106, and the regenerative power or energy that is captured is used for traction power for the regenerative braking components 106.
A · US 2011/0251770 A1 · ¶ 33
The electric machines 14 can provide propulsion and deceleration capability when the engine 18 is turned on or off. The electric machines 14 also act as generators and can provide fuel economy benefits by recovering energy that would normally be lost as heat in the friction braking system.
B · US 9,815,373 B2 · ¶ 21
1.4a power storage device configured to be charged with the electric power generated by the fuel cell system and regenerative electric power generated by the motor generator during regenerative braking,
The energy storage system 107 (for example, a battery) captures regenerative energy during braking of the regenerative braking components 106 as kinetic energy is transformed into electrical energy.
A · US 2011/0251770 A1 · ¶ 33
For example, if the engine is running but the controller has reduced its output based on anticipated regenerative energy, the engine output can be increased if the regenerative energy collected is less than expected, or decreased further if the regenerative energy collected is more than expected.
B · US 9,815,373 B2 · ¶ 50
1.5the control device comprising one or more processors that execute computer-executable instructions stored in a memory,
During operation, the program 130 is stored in the memory 122 and executed by the processor 120.
A · US 2011/0251770 A1 · ¶ 29
The processes, methods, or algorithms disclosed herein can be deliverable to/implemented by a processing device, controller, or computer, which can include any existing programmable electronic control unit or dedicated electronic control unit.
B · US 9,815,373 B2 · ¶ 54
1.6wherein the one or more processors execute the computer-executable instructions to cause the control device to control the electric power generated by the fuel cell system, the motoring electric power of the motor generator, the regenerative electric power of the motor generator, a remaining capacity of the power storage device, and a charge and discharge electric power amount of the power storage device, and
A maximum regenerative braking torque is then determined (step 220). The maximum regenerative braking torque preferably corresponds to a dynamic value corresponding to a maximum regenerative energy capture for the energy storage system at any particular point in time, as calculated using dynamic variable inputs.
A · US 2011/0251770 A1 · ¶ 44
In block 824, the controller discharges the battery by either keeping the engine shut-down longer while in EV-mode in order to use more battery energy for EV operation, or by reducing the engine output power and/or duration if the engine is running in order to use more battery energy for combined (hybrid) operation. In block 826, the actual regenerative energy is compared to the expected regenerative energy, and the request is modified if appropriate.
B · US 9,815,373 B2 · ¶ 50
1.7in a case where a planned travel route of the vehicle includes a first charging section which is located ahead of the vehicle and in which the motor generator generates the regenerative electric power, a motoring section which is located ahead of the first charging section and in which the motor generator consumes the motoring electric power, and a second charging section which is located ahead of the motoring section and in which the motor generator generates the regenerative electric power, the one or more processors cause the control device to:
If future information is known, such as a future route based on topographical information, future changes in elevation, future auxiliary load usage, or a future recharge event, the potential regenerative energy calculation may include this information. The knowledge of a future speed and a future road grade along a future route allows a predicted kinetic energy and predicted potential energy to be determined.
B · US 9,815,373 B2 · ¶ 53
1.8regard a section obtained by combining the first charging section, the motoring section, and the second charging section as a combined control section in which charge and discharge control is performed on the power storage device, in a case where a predicted regenerative electric power amount in the first charging section is larger than a predicted motoring electric power amount in the motoring section; and
1.9before the vehicle reaches a start point of the combined control section, control an amount of the electric power generated by the fuel cell system based on a predicted charge and discharge electric power amount in the combined control section, in a manner so that a charge margin allowing the power storage device to be charged with the predicted regenerative electric power amount in the combined control section remains in the power storage device.

An empty cell means only that no passage was reproduced there.

Statements in these documents
However, the true maximum regenerative braking torque for the vehicle may vary at different times and/or under different conditions.
A · US 2011/0251770 A1 · ¶ 2
The maximum regenerative braking torque corresponds to a maximum regenerative energy capture for the energy storage system.
A · US 2011/0251770 A1 · ¶ 6
Cite aspatent.fyi, US 2026/0356247 A1, claim 1, first published 2026-11-19T22:39:24-05:00, https://patent.fyi/US20260356247/, SHA-256 c47391aa3a74ada5b6f85b09ca87749e1a3f0375febced12c98fc83560c767d3
First published
Permanent addresshttps://patent.fyi/US20260356247/
Content fingerprint (SHA-256)c47391aa3a74ada5b6f85b09ca87749e1a3f0375febced12c98fc83560c767d3
Methodv2026-11-18.2 · automated, not reviewed by a person
Correctionscorrections@patent.fyi