1.1Fixed gantry over one bay
Operators attach the tarp to two spreaders while the bay is empty. The gantry hoists the spreaders above the load clearance height, and the transporter backs into the bay for tarp placement.
Generated automatically. Not reviewed by a person. Not legal advice or an opinion.
Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.
Operators attach the tarp to two spreaders while the bay is empty. The gantry hoists the spreaders above the load clearance height, and the transporter backs into the bay for tarp placement.
A clamp strip secures the leading edge of the tarp to the draw bar. Two cables driven by a common shaft pull the bar along overhead guides, unwinding the tarp from a braked roll at the front of the bay. Operators unfold the side flaps after the tarp spans the load.
A scissor lift raises the folded tarp from waist height to two stationary spreaders. Hooks on the spreaders engage reinforced tarp loops, and the platform retracts to transfer the tarp weight to the hooks.
The preparation position sits above a drive-through lane, and the spreaders hold the tarp above the load clearance height. The driver advances to a marked stop that aligns the load under the tarp before lowering begins.
Drums on the spreaders pay out straps clipped to reinforced points along both tarp edges. The center panel settles onto the load, and continued payout lets the edges descend along the transporter sides. Operators release the clips and secure the tarp edges.
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
A plant nursery installs a lateral carriage above a tarp preparation bay and an adjacent cart lane. Two parallel spreaders carry a breathable fabric tarp on spring clips spaced along both edges. The carriage lifts the loaded spreaders, moves them over a cart carrying potted plants, and lowers them along the cart sides to drape the tarp over the plants. The clips release after the operator secures the tarp to the cart frame.
Two guided roller-chain lifts replace the cable-and-drum hoists on the lateral carriage. Each spreader attaches at both ends to moving chain runs, and a common shaft drives the two upper sprockets for that spreader. A geared brake motor on each shaft holds its spreader at the preparation height and raises it for lateral transfer. The motors reverse together at the application bay to lower the spreaders along the transporter sides.
The carriage carries two longitudinal spreaders on transverse guide rails that provide 2.6 to 3.2 m of centerline spacing. A shaft couples lead screws at the front and rear of the carriage so the spreaders move symmetrically and stay parallel. For trailers 2.4 to 2.6 m wide, the operator sets the spacing to the widest measured load or trailer dimension plus 0.4 m before attaching the tarp. Locking pins hold that setting during lifting, lateral travel, and lowering.
A flush-mounted weighbridge occupies the application bay, and the carriage runway stands on columns founded outside the weighing deck. The weighbridge controller records a stable weight while the raised tarp remains in the preparation bay. The recorded weight and a vehicle-position signal permit the carriage to move across and lower the tarp along the vehicle sides. The weighing record identifies the vehicle and stores its weight before the tarp is applied.
An overhead laser scanner maps the top and outer edges of the stationary load in the application bay. A controller uses the highest valid point and measured tarp sag to set a transfer height that keeps the tarp at least 300 mm above the load. Lift encoders confirm that both spreaders reach the commanded height before the carriage travels laterally. At the application position, the controller checks that each spreader lies outside the mapped load edges and lowers both to the programmed drape height.
Inline tension sensors sit between the tarp clips and each spreader at the front and rear attachment points. With the carriage centered over the transporter, a controller reads all four sensors while the spreaders descend along the sides. The controller slows both drives as any reading approaches a limit established for the tarp and clips, and stops both drives when a reading reaches that limit. The operator clears the snag and resets the controller before descent resumes.
Two rails on the cradle support the folded tarp and hold its edge loops open. Retractable pins on the lowered spreaders engage the loops, and the hoist lifts the tarp clear of the cradle.
Operators place the two reinforced tarp hems on the lowered spreaders and close over-center clamps at intervals along each hem. Rubber pads distribute clamp pressure and grip the coated fabric.
A geared motor turns a common shaft with four single-layer grooved drums. Each drum winds a wire rope attached near one end of a spreader, and the shared shaft takes up the four ropes together to keep the tarp level.
Roller guides hold the spreaders at a fixed lateral spacing while the hoist lowers them along opposite sides of the transporter. The tarp center settles onto the load as the spreaders descend to a preset height for edge release.
Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.
In a manner presently to be described, first trolley system 52 is movable along first track assembly 53 between a first position over the dock 28 and a second position over the vessel 22. As best seen in FIG. 3, first trolley system 52 comprises a first upper spreader 62, a first lower spreader 64 for interconnection with a shipping container, a first pair of spaced-apart cables 68 and 70 interconnecting the spreader and a conventional cable drive system 71 for raising and lowering the lower first spreader 64.B · US 2008/0264889 A1 · ¶ 36
In the current method, the lift mechanism is also moved between a contracted position (that is at substantially the same elevation as the stowed position of the lift mechanism) and an extended position wherein a lift deck of the lift is raised to at least the elevation of the cargo support surface of the vehicle. Additionally, tarps may be placed on the lift deck and raised with the lift deck and then placed on cargo that is on the trailer support surface.A · US 2007/0140820 A1 · ¶ 11
Additionally, tarps may be placed on the lift deck and raised with the lift deck and then placed on cargo that is on the trailer support surface.A · US 2007/0140820 A1 · ¶ 11
As best seen in FIG. 3, first trolley system 52 comprises a first upper spreader 62, a first lower spreader 64 for interconnection with a shipping container, a first pair of spaced-apart cables 68 and 70 interconnecting the spreader and a conventional cable drive system 71 for raising and lowering the lower first spreader 64.B · US 2008/0264889 A1 · ¶ 36
Referring also to FIG. 4 of the drawings, the modified crane system of the invention can be seen to include a second track system 71 that is carried by elongated boom 36 and a second trolley system 72 carried by second track system 71 and is movable therealong between a first position over the dock 28 and a second position over the vessel 22.B · US 2008/0264889 A1 · ¶ 38
Once near the top of the cargo 22, the operator of the truck may roll the tarps 36 onto the cargo 22 and distribute the tarps 36 along the length of the cargo 22.A · US 2007/0140820 A1 · ¶ 24
An empty cell means only that no passage was reproduced there.
Therefore, a need exists for better methods of getting from ground level to cargo height, then returning safely back to ground, without ever lifting the tarps.A · US 2007/0140820 A1 · ¶ 6
The invention provides apparatus for, and methods of, lifting tarps and drivers to cargo level safely while tarping loads on a flatbed trailer.A · US 2007/0140820 A1 · ¶ 7
A major problem with such systems is that the ability to use only a single trolley in such systems drastically restricts the capacity of the system.B · US 2008/0264889 A1 · ¶ 4
It is an object of the present invention to provide a novel dual trolley, single boom crane system that effectively doubles the rate of container loading and unloading of conventional prior art single boom crane systems.B · US 2008/0264889 A1 · ¶ 9
patent.fyi, US 2026/0356276 A1, claim 1, first published 2026-11-19T23:14:26-05:00, https://patent.fyi/US20260356276/, SHA-256 c573785c934d683c38b6a5e034455856844916b9c23fa52ac6c0945e5cf6b1e8