patent.fyi
Applications  /  US 2026/0364867
United States Patent Application Publication

US 2026/0364867 A1

Published
Nov 19, 2026
Filed
Mar 30, 2026
Earliest date on the face
May 14, 2025
Classification
B29C 45/7653
First published here
Nov 23, 2026

Generated automatically. Not reviewed by a person. Not legal advice or an opinion.

Section 1 · machine-generated

What if?

Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.

1.1Self-locking toggle clamp

What ifWhat if a hand lever closes the mold through a self-locking toggle and the machine controller operates only the injection unit?
Claim language“a control device that controls a mold clamping unit”

The hand lever drives the toggle past dead center against a mechanical stop, and a threaded platen adjuster sets the preload. A switch at the stop enables injection after the toggle locks.

1.3Force selection by calculation

What ifWhat if the controller selects a lower clamping force by calculation before running any cycles at that force?
Claim language“based on an actual result obtained”

The controller multiplies the projected area of the cavities and runners by the predicted peak cavity pressure to estimate the mold opening load. It applies a preset margin and accepts the lower force setting when the setting meets or exceeds the calculated requirement.

1.3Upward force qualification

What ifWhat if the controller tests a higher clamping force when the mold opens excessively during packing?
Claim language“a second mold clamping force that is smaller”

The controller raises the force setpoint by a fixed increment and records peak parting-line displacement during the next three cycles. It retains the higher setpoint when all three readings fall below the mold's displacement limit.

1.4Independent downstream part sorting

What ifWhat if a downstream inspection station sorts the parts and keeps its inspection results separate from the clamp controller?
Claim language“receive an input indicating whether a quality defect”

A backlit camera measures flash along the part outline, and a pneumatic gate diverts parts that exceed the flash limit. The clamp controller uses parting-line displacement measured during packing to assess the force setting.

1.5Force selection by mold identifier

What ifWhat if the controller selects the production clamping force from a stored table indexed by mold identifier?
Claim language“based on a determination result and an input result”

At mold installation, the controller reads a coded tag on the mold and loads the corresponding force setpoint from nonvolatile memory. It applies that setpoint at the start of the production run and maintains it throughout the run.

Section 2 · machine-generated

Variations

Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.

Other field of use

Clamp force trials for ceramic feedstock

A ceramic injection molding press fills a split mold with alumina powder dispersed in a thermoplastic binder. During a trial at a lower clamp force, displacement probes mounted across the parting line record peak mold opening during filling and packing. An operator inspects the ejected green part for flash and incomplete filling and enters a defect flag. The controller uses the recorded opening and defect flag to select a production force or initiate a lower-force trial.

Component substitution

Hydraulic ram in place of toggle

A direct-acting hydraulic ram replaces the toggle linkage in the clamping unit and acts on the moving platen. A proportional valve regulates pressure in the ram, and a calibrated strain gauge on each tie bar supplies a load reading for the clamp force feedback loop. The controller lowers the force command for the trial and records parting-line movement during packing. The controller uses the movement record and the part inspection input to select the next force command.

Parameter or scale variation

Force trials in six shot blocks

A press running at 800 kN tests a second force of 760 kN in a block of six shots. The controller records the peak parting-line opening and a defect flag for each of the last five shots, starting after one settling shot. A block with a peak opening of 10 micrometers or less on every measured shot and zero reported defects qualifies the force for production. When those conditions are met and every measured shot stays at or below 5 micrometers, the controller runs the next six-shot block at 740 kN before selecting a production force.

Combination with existing systems

Force trials with cavity sorted inspection

A takeout robot transfers parts from a multicavity mold to separate conveyor lanes assigned to their cavities. At each lane, an inspection station records flash and incomplete filling against the molding cycle and cavity identifiers. The press controller links those results to the trial force and the peak parting-line opening recorded for the same cycle. It waits for inspection results from every cavity before selecting a production force or running a lower-force trial.

Automated or data-driven variant

Automatic defect input from backlit images

A robot places each trial part in a locating fixture between a backlight and a camera with a telecentric lens. Image processing aligns the part silhouette to a stored reference and checks each inspection region for excess or missing material against its dimensional tolerance. The inspection processor sends a defect flag and cycle identifier to the press controller. The controller combines that flag with the peak mold opening measured during the same cycle to select a production force or a lower trial force.

Trial force selected from opening data

The controller stores the measured clamp force, peak parting-line opening, and inspection result for each trial block in the current mold setup. After collecting data at three or more force settings, it fits a monotonic curve that represents increasing mold opening as force decreases. If the latest block passes inspection, the controller selects a lower trial force whose predicted opening stays below the configured limit by at least the probe repeatability margin, with the reduction capped at 5 percent. It measures opening and checks the defect input at the proposed force before adopting that force for production.

Specific version of a part

Permanent restoration of baseline force

The controller retains the second force only when parting-line movement is within limits and the inspection input reports no defect. If either check fails, the controller writes the first force back to the production recipe and ends the adjustment sequence.

Hydraulic clamp with strain feedback

A proportional pressure valve regulates the hydraulic cylinder that loads the moving platen. The controller sums the loads calculated from strain sensors on four tie bars and trims valve current until the measured clamping force reaches the setpoint.

Trial with parting-line sensors

The controller temporarily reduces the set clamping force by five percent for five molding cycles. Two displacement probes on opposite sides of the mold measure parting-line movement during filling and packing, and the controller accepts the force when both readings stay within the configured limit on all five cycles.

Operator entry for trial parts

The operator checks each trial part for flash at the parting line and enters a defect-present or defect-absent result at the machine panel. The controller associates the entry with the trial cycle number and its force setpoint.

Midpoint selection after a defect

When displacement at the second force is within limits but the inspection input reports a defect, the controller sets the production force to the arithmetic midpoint of the first and second forces. When displacement is within limits and the inspection input reports no defect, the controller temporarily tests a third force five percent below the second force.

Section 3 · quoted from USPTO records

Other work

Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.

Document AUS 2018/0319064 A1
Published
Nov 8, 2018
Filed
May 2, 2018
Class
B29C 45/7653
Document BUS 11,230,043 B2
Published
Jan 25, 2022
Filed
Jun 4, 2020
Class
B29C 45/76
Claim 1
Document A
Document B
1.1a control device that controls a mold clamping unit that clamps a mold,
A controller 212, optionally in conjunction with a virtual cavity sensor (not depicted), compares the strain value to a target strain profile and increases or decreases the flow of hydraulic oil to piston valves 206 and/or lock nut valves 204 to increase or decrease the amount of clamping force or the rate of clamping accordingly.
A · US 2018/0319064 A1 · ¶ 40
The injection-molding equipment 30 includes a molding machine 310, a mold 320 connected to the molding machine 310, and a clamping assembly 330 used to clamp mold halves 322 and 324 of the mold 320. In some embodiments, the injection-molding equipment 30 further includes a controller 340 configured to control and monitor real-time functions of the molding machine 310 and a display 350 for displaying data related to the performance and operation of the molding machine 310 to the on-site technician 50.
B · US 11,230,043 B2 · ¶ 51
1.2wherein the control device is configured to
1.3determine, based on an actual result obtained in a case where a set mold clamping force of the mold is temporarily changed from a first mold clamping force to a second mold clamping force that is smaller than the first mold clamping force, whether the second mold clamping force is appropriate,
The method includes creating a target strain profile, receiving a deviation limit, receiving a change in strain relating to a mold while it is closing from a first strain gauge, identifying a deviation from a target strain profile based on the output from the first strain gauge, determining that the deviation exceeds the deviation limit, and adjusting the rate or force of clamp movement.
A · US 2018/0319064 A1 · abstract
At step 706, at least one trial molding is performed using the provisional molding conditions to obtain a plurality of intermediate molding conditions. At step S708, it is determined whether the intermediate molding conditions are the same as the corresponding provisional molding conditions.
B · US 11,230,043 B2 · ¶ 52
1.4receive an input indicating whether a quality defect of a molded product molded in a case where the set mold clamping force is temporarily changed to the second mold clamping force is present, and
In some embodiments, the intermediate molding conditions can be obtained by monitoring real-time functions of the trial molding or detecting/measuring a trial molded product. The intermediate molding conditions provided by the injection-molding equipment 30 are transmitted to the computer 20.
B · US 11,230,043 B2 · ¶ 42
1.5determine, based on a determination result and an input result, whether to change the set mold clamping force from the first mold clamping force to the second mold clamping force, a mold clamping force between the first mold clamping force and the second mold clamping force, or a mold clamping force close to the second mold clamping force, or temporarily change the set mold clamping force to a third mold clamping force that is smaller than the second mold clamping force.
At step S710, if the intermediate molding conditions are the same as the corresponding provisional molding conditions, then the provisional molding conditions are set as the actual molding conditions. At step S712, if the intermediate molding conditions are not the same as the provisional molding conditions, then optimized provisional molding conditions are set as actual molding conditions.
B · US 11,230,043 B2 · ¶ 52

An empty cell means only that no passage was reproduced there.

Why these two documents?

Only Document B has a passage for 1.4 1.5. Both have a passage for 1.1 1.3. Both are classified in CPC B29C, as is this patent.

Additional background

Sentences reproduced word for word from these documents that state a problem, a purpose or benefit, a field of use, or an application or improvement.

Whatever the type of injection molding process being carried out, monitoring of the process over time is desirable in order to identify and correct any problems as soon as possible.
A · US 2018/0319064 A1 · ¶ 5

Related claim parts: 1.4 1.5

One particular motivation to monitor flow front position and/or control internal pressure at certain times during the short duration of filling of a mold cavity is to account for flow filling challenges.
A · US 2018/0319064 A1 · ¶ 5
The advantages of coining include, but are not limited to, reduced flash due to smaller vents, lower clamping tonnage requirements, and reduction or elimination of weld lines.
A · US 2018/0319064 A1 · ¶ 7
In general, the setting of molding conditions in an injection-molding machine requires a large number of trial molding operations and a lengthy setup time.
B · US 11,230,043 B2 · ¶ 4
The analytical data generated by a virtual molding process using computer-implemented simulation is based on idealistic cases that do not take into account properties of actual injection-molding machines or molding materials during molding processes.
B · US 11,230,043 B2 · ¶ 4
Cite aspatent.fyi, US 2026/0364867 A1, claim 1, first published 2026-11-23T07:48:37-05:00, https://patent.fyi/US20260364867/, SHA-256 a398d73a0de228db94a68969185107f8d2cbc2db222d3516ec5028ae22d43827
First published
Permanent addresshttps://patent.fyi/US20260364867/
Content fingerprint (SHA-256)a398d73a0de228db94a68969185107f8d2cbc2db222d3516ec5028ae22d43827
Methodv2026-11-18.2 · automated, not reviewed by a person
Correctionscorrections@patent.fyi