Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.
1.1Single central turret mooring cluster
What ifWhat if the mooring arrangement uses a single central turret cluster that allows the floating unit to weathervane?
Claim language“multiple mooring clusters”
A cylindrical turret housing mounted through the bow hull structure rotates on roller bearings relative to the floating unit. All mooring lines descend from a chain table at the base of the turret to anchors distributed radially around the hull. Fluid swivels at the top of the turret transfer cargo and control signals while the vessel aligns freely with prevailing wind and current directions.
1.1Connection through a single subsurface buoy
What ifWhat if the mooring clusters connect to a single subsurface buoy that links to the floating unit through one hawser?
Claim language“each connectable to a floating unit”
Radial mooring clusters terminate at a cylindrical steel buoyancy tank submerged 25 meters below the water surface. A single braided polyester hawser extends from a padeye on top of the buoy to a bow stopper on the floating unit. The buoy absorbs vertical wave motions so the hawser experiences primarily horizontal tension.
1.1Mid-water hydrodynamic drogue station keeping
What ifWhat if the mooring lines terminate at mid-water hydrodynamic drogues suspended in the water column?
Claim language“adapted for the seabed”
Parachute-shaped fabric drogues deployed at depths of 50 to 150 meters open against deep ocean currents to generate hydrodynamic drag. Mooring lines connect the floating unit bow fairleads to the drogue bridles. The drag resistance maintains vessel heading into the wind and reduces drift speed without touching the seabed.
1.2Single rigid articulated mooring strut
What ifWhat if a mooring cluster uses a single rigid articulated steel strut?
Claim language“at least two mooring lines”
A hollow cylindrical steel strut connects the hull to a seabed foundation through universal joints at both ends. Internal buoyancy chambers within the strut reduce the static vertical load on the hull joint. Axial tension and compression along the rigid strut restrain horizontal drift without flexible catenary lines.
1.3Separate anchors for each mooring line
What ifWhat if the mooring lines of a cluster terminate at separate anchors spaced apart on the seabed?
Claim language“connected to the same anchor”
Each mooring line in a cluster runs from a hull fairlead to its own dedicated drag-embedment anchor positioned 15 to 30 meters laterally from the adjacent anchor. Spacing the anchors apart prevents adjacent lines from chafing against each other near the seabed mudline. Each anchor carries only the tension of a single line, allowing smaller anchor flukes and lighter installation vessels.
Section 2 · machine-generated
Variations
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
Other field of use
Parallel mooring clusters for floating solar arrays
A floating photovoltaic platform in a sheltered reservoir uses multiple mooring clusters attached to perimeter pontoons and anchored to the reservoir bed. Each mooring cluster consists of two parallel synthetic ropes that terminate at separate fairleads on a single concrete deadweight anchor block. The two lines share tensile loads induced by wind and water level fluctuations across the array perimeter. During maintenance, one line in a cluster is slackened and replaced while the second line maintains array position.
Component substitution
Hybrid synthetic fiber and chain mooring lines
Each mooring cluster pairs a high-modulus polyethylene rope with a studless steel chain, both terminating at a single suction pile anchor on the seabed. The steel chain forms the ground segment along the seabed to resist abrasion, while the synthetic rope forms the upper catenary segment connected to a hull-mounted fairlead. At the anchor padeye assembly, a dual-shackle triangular plate joins both parallel lines to the single suction pile. Differences in axial stiffness between the two materials are accommodated by setting distinct pretension lengths on the hull winches.
Torpedo-installed gravity anchors for parallel mooring clusters
Each mooring cluster terminates at a single finned steel torpedo anchor embedded vertically into soft clay seabed sediments. Two parallel polyester mooring lines attach to a swiveling padeye collar welded to the upper tail section of the torpedo shaft. During installation, the torpedo anchor is released from a surface vessel and penetrates 15 to 25 meters into the seabed under its own kinetic energy while trailing both parallel lines. Once embedded, the vertical shaft resists omnidirectional uplift and lateral loads transferred simultaneously through both lines.
Parameter or scale variation
Triple-line mooring cluster for deepwater tensioned legs
Each mooring cluster comprises three parallel steel wire ropes connected to a single driven pile anchor at a water depth of 1200 meters. The three lines attach to hull-side fairleads spaced 35 meters apart horizontally to distribute hull bending moments across three bulkhead frames. Each line operates at a static pretension of 2500 kilonewtons and carries a 15-ton clump weight positioned 400 meters from the anchor to increase restoring stiffness. Under extreme storm loading, the three-line cluster provides a combined minimum breaking load of 24000 kilonewtons.
Combination with existing systems
Mooring cluster integrated with dynamic power cables
A floating offshore wind turbine uses dual-line mooring clusters combined with a lazy-wave subsea power cable routed alongside one mooring cluster. Buoyancy modules clamped along the power cable maintain an S-shaped profile that tracks the excursion envelope of the adjacent parallel mooring lines without contacting them. At the floating hull, a bend stiffener and hang-off flange support the power cable between the two mooring fairleads, while the two mooring lines terminate at a shared drag-embedment anchor. This geometry keeps cable curvature within its minimum bend radius limit during surge and sway excursions.
Automated or data-driven variant
Load-cell feedback control for parallel line tensioning
Inline strain-gauge load cells mounted at each fairlead continuously measure axial tension in both parallel lines of a mooring cluster at a 10-hertz sampling rate. A programmable logic controller compares the measured tension differential against a target threshold and computes required line payout or haul-in lengths. Hydraulic chain jacks adjust the length of the more slack or heavily loaded line until tension imbalance between the parallel lines falls below 5 percent. Acoustic inclinometers at the shared anchor transmit inclination data to the controller to verify even load transfer into the seabed.
Specific version of a part
Suction caisson anchor for clay seabed
A cylindrical steel suction caisson with a closed top cap and an open bottom skirt serves as the seabed anchor. During installation, a submersible pump evacuates water from inside the caisson so hydrostatic pressure drives the 4-meter-diameter skirt 18 meters into soft marine clay. A forged padeye welded along the outer caisson wall at two-thirds penetration depth receives the mooring shackle to maximize lateral soil resistance.
Parallel polyester ropes with chain tails
A mooring cluster comprises two parallel high-modulus polyester fiber ropes arranged side by side between a bow chain stopper assembly and the seabed. Each polyester rope has a jacketed braided core rated for 8,000 kilonewtons and connects at both ends to short studless steel chain tails via forged pear-shaped links. Fairlead sheaves spaced 1.5 meters apart on the hull keep the two lines separated and prevent twisting under wave-induced yaw.
Dual-padeye lug on shared anchor pile
A single driven steel anchor pile features a forged collar welded near its mudline section with two side-by-side padeyes spaced 0.8 meters apart. Two parallel ground chains from the same mooring cluster attach independently to the two padeyes using bow-type anchor shackles with lock-pinned bolts. Sharing one pile allows both lines to transfer load into the same foundation while permitting individual line tensioning or replacement.
Section 3 · quoted from USPTO records
Other work
Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.
1.1multiple mooring clusters each connectable to a floating unit (1) and an anchor (3) adapted for the seabed (6)
Contemplated mooring systems have one or more primary tethers that extend laterally and to which respective pluralities of independent secondary tethers are coupled that in turn are coupled to floating marine devices, and especially wave energy converters. The primary tethers are coupled to preferably static seabed anchors and will so provide a simple and dynamic mooring system that provides multiple operational advantages while allowing for simple deployment and maintenance.
A · US 2016/0075409 A1 · abstract
1.2wherein at least one mooring cluster comprises at least two mooring lines (4a, 4b)
While it is generally preferred that the primary and/or secondary tethers are single lines, it should be recognized that the primary and/or secondary tether may be configured as a split tether, a forked tether, or even as multiple tethers.
A · US 2016/0075409 A1 · ¶ 56
In this manner a tension leg comprising two parallel mooring lines 73, 74 can be formed.
B · US 2022/0063767 A1 · ¶ 49
1.3wherein the mooring arrangement is characterized by the at least two mooring lines (4a, 4b) of the same mooring cluster are adapted to be connected to the same anchor (3).
Therefore, and viewed from a different perspective, a mooring system for an array of wave energy converters is contemplated that includes a plurality of primary tethers to which a plurality of secondary tethers are coupled, respectively, wherein the secondary tethers are coupled to the respective primary tethers at predetermined distances along a length of the primary tether, and wherein at least two of the primary tethers are coupled to a shared seabed anchor.
A · US 2016/0075409 A1 · ¶ 14
As shown here, the yoke plate assembly 100 is arranged on an anchor body 1 that is located on a seabed 3. Further, the yoke plate assembly 100 is coupled to a pair of mooring lines or mooring chains 5a, 5b that are attached to a floating object (not shown).
B · US 2022/0063767 A1 · ¶ 27
An empty cell means only that no passage was reproduced there.
Why these two documents?
Only Document A has a passage for 1.1. Both have a passage for 1.21.3. Both are classified in CPC B63B, as is this patent.
Additional background
Sentences reproduced word for word from these documents (and from a third earlier document, Document C) that state a problem, a purpose or benefit, a field of use, or an application or improvement.
No. 8,686,582, or WO 2013/182837), currently known moorings in arrays are environmentally disruptive to the sea bed and present a substantial financial burden.
A · US 2016/0075409 A1 · ¶ 6
Consequently, there is still a need for improved systems and methods of mooring an array of wave energy converters.
A · US 2016/0075409 A1 · ¶ 8
Advantageously, the yoke plate assembly according to the invention, allows to achieve an improvement of load sharing between two mooring lines each connected at a respective end of the elongated yoke plate.
B · US 2022/0063767 A1 · ¶ 5
In an embodiment, the yoke plate assembly as described above is arranged with articulation selected from a group comprising a one-axis joint, a two-axis joint, a gimbal joint, a rotary joint.
B · US 2022/0063767 A1 · ¶ 7
This invention relates generally to systems and methods for mooring floating structures such as floating vessels, platforms or rigs placed at sea.
C · US 8,037,838 B2 · ¶ 1
Related claim parts: 1.21.3
Document C: US 8,037,838 B2, published Oct 18, 2011. Cited for this statement only.
Cite aspatent.fyi, US 2026/0365284 A1, claim 1, first published 2026-11-22T23:10:46-05:00, https://patent.fyi/US20260365284/, SHA-256 0ea9102f2ebeedd2f081b74ae82eb77f37af976c3a0bf5308ef67a5bef9eb969