Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.
What ifWhat if the boundary conditions are computed automatically from historical equipment telemetry and component wear curves rather than defined by a user?
Claim language“defined by a user”
A statistical profiler analyzes vibration amplitudes, bearing temperatures, and cycle counts recorded over previous production runs to establish failure probability thresholds. These calculated limits, combined with fixed machine capacity ratings from equipment specification tables, form hard operational constraints. The planner enforces these machine-derived bounds without requiring operator-supplied preference inputs.
1.5Model-free empirical correlation tables
What ifWhat if the method uses an empirical lookup table of historical throughput and downtime correlations without a formal system model?
Claim language“a formal system model”
A data aggregator compiles past maintenance intervals, conveyor speeds, and changeover durations into an indexed multi-dimensional table keyed by product type and line state. When scheduling a new shift, the planner retrieves average cycle times and failure rates directly from matching historical entries. Line interactions are estimated from observed co-occurrence frequencies rather than explicit energy, data, or material flow equations.
1.6Deterministic mixed-integer linear solver
What ifWhat if the planning inputs and system relationships are processed by a deterministic mixed-integer linear solver rather than an artificial intelligence (AI) system?
A matrix generator translates flow balance equations, maintenance window constraints, and production targets into linear inequalities with integer decision variables for task start times. A branch-and-bound solver iteratively partitions the feasible region and computes upper and lower objective bounds using simplex pivots. The solver returns a mathematically proven optimal schedule without statistical learning or neural inference.
1.7Single-pass greedy dispatching schedule
What ifWhat if the planner constructs a single schedule directly using sequential dispatching rules without defining a solution space?
Claim language“a solution space”
A priority queue ranks pending maintenance tasks and loading batches by earliest due date and remaining component life. At each simulated time step, a dispatching routine assigns the highest-ranked task to the next available machine slot that satisfies capacity limits. This single-pass construction produces one executable timeline immediately without enumerating alternative candidate plans.
Section 2 · machine-generated
Variations
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
Other field of use
Maintenance and loading planning for pharmaceutical blister lines
A planning system schedules maintenance and material loading for a pharmaceutical packaging line containing tablet feeders, blister thermoformers, foil sealers, and cartoning units. An input interface receives batch production schedules, cleanroom sterilization intervals, and operator preferences such as minimal batch changeover delay and maximum line availability. A formal system model maps material flow of blister films, tablets, and cartons alongside compressed air and electrical power dependencies between adjacent stations. A constraint-based artificial intelligence solver constructs a solution space of candidate cleaning, maintenance, and hopper-loading sequences and outputs a synchronized schedule.
Component substitution
Mixed-integer linear programming solver for schedule optimization
A mixed-integer linear programming solver replaces a general artificial intelligence search engine for generating maintenance and loading plans. The formal system model encodes machine dependencies, energy flows, and material buffers as linear inequality constraints and binary decision variables over discrete time slots. User preferences and production targets are formulated as weighted terms in a single linear objective function. The solver executes branch-and-bound optimization over the feasible polyhedron and outputs the optimal maintenance and loading schedule.
Graph neural network surrogate for rapid space pruning
A graph neural network trained on historical machine line schedules replaces exhaustive enumeration when defining and searching the solution space. The formal system model is represented as a directed property graph where nodes correspond to processing stations and edges represent material, energy, and data flows. Node embeddings capture current machine states, maintenance backlogs, and preference weights, allowing the network to score and prune unpromising loading and maintenance branches before final evaluation. The remaining high-scoring candidate plans are verified against hard production constraints and output as the final schedule.
Parameter or scale variation
High-frequency rolling horizon planning with fifteen-minute intervals
The planning engine operates on a rolling horizon of 24 hours divided into 96 discrete time intervals of 15 minutes each, rather than daily or weekly blocks. Every 15 minutes, the input interface ingests updated production counts, buffer levels, and maintenance task durations across 10 to 30 serially connected machines. The artificial intelligence system restricts the solution space to actions within the next 4 hours for immediate loading and 24 hours for preventive maintenance, limiting search latency to under 30 seconds. An updated schedule is emitted at the end of each cycle to adjust technician dispatches and material replenishment.
Combination with existing systems
Integration with warehouse management and autonomous mobile robots
The maintenance and loading planning system connects via a message broker to a warehouse management system and a fleet controller for autonomous mobile robots. The warehouse management system supplies real-time pallet inventory, staging lane availability, and restocking lead times through the input interface as loading boundary conditions. When the artificial intelligence system selects an optimal loading plan, the output module translates material replenishment tasks into transport missions for the fleet controller. The robots deliver packaging consumables and raw materials to line-side buffers in synchronization with scheduled machine stops.
Automated or data-driven variant
Vibration and thermal sensor feedback for predictive maintenance
Accelerometers, temperature probes, and motor current transducers mounted on bearings and drive shafts stream condition data into a remaining-useful-life regression model. The regression model converts raw sensor time series into failure probability distributions and recommended service windows, feeding them automatically into the planning data input without manual entry. The formal system model updates machine degradation rates and energy consumption coefficients based on the live telemetry. The artificial intelligence system searches the updated solution space to schedule component replacements during planned product changeovers before wear thresholds are exceeded.
Specific version of a part
Direct controller and database ingestion
A background synchronization daemon queries programmable logic controllers and production order databases at fixed intervals over a local industrial network. It maps raw counter values, fault logs, and shift schedules into structured records using predefined schema templates. The resulting dataset feeds directly into the planning engine without manual entry or a graphical interface.
Direct automated actuator command dispatch
An execution gateway translates the computed maintenance intervals and material loading sequences into low-level state transitions and motor speed setpoints. The gateway transmits these timed command frames over an industrial fieldbus directly to programmable logic controllers and automated palletizers. Equipment executes the sequence autonomously in real time with no human-readable plan file generated.
Condition-based bearing wear and hopper load records
The planning data structure stores per-machine maintenance tasks as records containing component identifier, remaining useful life hours, required technician skill code, and spare part stock count. Loading parameters include conveyor buffer capacities in units, palletizer cycle rates in cases per minute, and changeover cleaning durations in minutes. These records reside in a relational database table indexed by machine station identifier and timestamp.
Time-indexed batch order and recipe schedule
Production planning data is formatted as a time-indexed table specifying target batch volume, container size, liquid viscosity class, and packaging film material for each scheduled run. Each entry includes earliest release time, customer delivery deadline, and mandatory sanitation washdown intervals between incompatible allergen recipes. The scheduler reads these parameters in fixed-length 15-minute time buckets across a rolling seven-day horizon.
Directed bipartite state-transition flow graph
The formal system model is constructed as a timed bipartite graph in which buffer nodes represent accumulation conveyors, surge tanks, and electrical busbars, while processing nodes represent fillers, cappers, and labelers. Directed arcs carry weighted tokens corresponding to unit material counts, kilowatt power draw, and digital status flags between connected stations. Processing node firing delays encode machine cycle times and stochastic micro-stoppage probabilities.
Multi-objective evolutionary search with non-dominated ranking
The search engine encodes candidate maintenance and loading schedules as integer chromosomes representing task start slots and machine assignments. Across 200 generations, tournament selection, two-point crossover, and swap mutation evolve a population of 100 candidate plans evaluated against weighted objective functions for total throughput, energy cost, and overtime hours. Non-dominated sorting ranks the resulting plans along a trade-off front to select the schedule that satisfies all user boundary conditions.
Cite aspatent.fyi, US 2026/0365357 A1, claim 1, first published 2026-11-22T23:31:03-05:00, https://patent.fyi/US20260365357/, SHA-256 b3e7be14cdef0ffb00ef6c67a948eae177ab3d75c0a5cd0647f3e5a789688cd0