patent.fyi
Applications  /  US 2026/0365486
United States Patent Application Publication

US 2026/0365486 A1

Published
Nov 19, 2026
Filed
Dec 29, 2025
Earliest date on the face
May 15, 2025
Classification
B66B 19/00
First published here
Nov 23, 2026

Generated automatically. Not reviewed by a person. Not legal advice or an opinion.

Section 1 · machine-generated

What if?

Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.

1.1Assemble individual loose parts in place

What ifWhat if individual loose brackets, rail sections, and door frames are assembled piece by piece in the first portion without a pre-assembled module?
Claim language“a first module”

Rigging crews hoist bundles of unattached steel guide rail lengths, wall brackets, and door sills directly onto a temporary working platform inside the shaft. Installers plumb vertical piano wires from top to bottom, drill anchor holes into the shaft wall, and bolt each bracket and rail segment individually. Electrical conduits and landing door headers are then mounted and wired separately on each floor.

1.4Install full-height assembly in one lift

What ifWhat if the module installation is performed in a single uninterrupted operation using one full-height pre-assembled shaft assembly?
Claim language“are repeated”

Technicians fabricate the entire multi-story steel frame, guide rails, and wiring harness as a single connected assembly on the ground or at an off-site yard. A heavy-lift crane hoists the full-height assembly vertically and lowers it in one pass into an open shaft slot left in the building floor plates. Workers then weld perimeter tie-backs at each floor slab simultaneously to lock the unit in place.

1.1Erecting loose components piece by piece

What ifWhat if individual guide rails, brackets, and door frames are erected separately in the first portion without using a pre-assembled module?
Claim language“installing a first module”

Crews position a temporary work platform inside the first portion of the shaft and drill anchor holes into the concrete wall using plumb-line laser targets. Individual steel T-section guide rails are lifted with a chain hoist and bolted sequentially to wall brackets at 2.5-meter vertical intervals. Landing door frames, sill angles, and wiring conduits are then mounted separately on each floor landing before the next shaft section is outfitted.

1.3Positioning the second module laterally adjacent

What ifWhat if the second module is installed in an adjacent bay at the same elevation as the first module to form a side-by-side multi-car shaft?
Claim language“at a higher position”

The first and second modules are placed side by side in a double-width structural opening at the same floor level and bolted together along a shared central divider beam. Each module houses a vertical linear-motor stator track and an independent ropeless car frame, with a horizontal turntable transfer unit mounted at the terminal level. Cars travel vertically through one module and shift laterally into the adjacent module at transfer levels to bypass stationary cars.

1.4Jacking modules upward from below

What ifWhat if the first module is jacked upward from the shaft pit so the second module is inserted underneath it?
Claim language“disposed above the first module”

Hydraulic climbing jacks mounted on the pit foundation lift the first module upward by one module height along temporary vertical guide posts. A wheeled carrier rolls the second module laterally into the pit opening directly beneath the suspended first module. The jacks lower the first module onto the top flange of the second module, where crews bolt the two units together before repeating the lift cycle.

Section 2 · machine-generated

Variations

Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.

Other field of use

Modular hoisting frame installation in underground mine shafts

A vertical shaft in an underground mine receives stacked hoisting modules as excavation advances downward or as shaft lining progresses upward. Each module comprises a corrosion-resistant steel frame carrying pre-mounted guide rails, ventilation ducts, and power busbars. A surface winch lowers each module into the completed shaft section, where rock bolts and grout anchors secure the frame to the concrete shaft liner. Mechanical alignment pins at the module corners engage mating sockets on the adjacent module to maintain plumb rail continuity across stacked sections.

Specific version of a part

Galvanized steel frame with pre-aligned rails

The first module consists of a hot-dip galvanized structural steel cage fabricated to a 1-millimeter dimensional tolerance with factory-mounted T-section guide rails and pre-wired traveling cable junction boxes. A tower crane lowers the cage into a cast-in-place reinforced concrete hoistway in the lower building stories, where workers bolt its corner base plates to embedded steel weld plates. Hydraulic leveling jacks at the four corners adjust the plumbness of the guide rails within 0.5 millimeters per meter before grouting the base plates.

Self-climbing crane placement of upper module

As upper concrete floor slabs cure, a hydraulic climbing jib crane mounted on the building core lifts the second module from a ground-level staging trailer to the upper hoistway opening. Tapered steel centering pins welded to the bottom corners of the second module engage mating conical sockets on top of the first module to guide alignment. Crew members torque high-strength structural bolts through internal splice flanges to lock the two modules together.

Zone-based module stacking for high-rise rise

The first portion spans the lower five stories of a high-rise structure, while the second portion spans stories six through ten directly above it. Each module includes a 15-meter vertical section of counterweight rails, landing door frames, and fire-rated shaft liner panels sized to match the five-story floor-to-floor height. Laser plumb targets mounted at the bottom pit verify that the upper module centerline stays within 3 millimeters of the lower module centerline.

Multi-stage stacking with temporary jump machine

Installers stack four 12-meter modules sequentially as core walls advance upward, placing a temporary traction drive beam on top of each newly installed module to operate a construction car in the completed lower shaft. Once the fourth module is bolted into place at the top of the hoistway, technicians remove the temporary drive beam and mount the permanent gearless traction machine on the top module's structural cap. Final commissioning connects the continuous hoist ropes, governor cable, and serial communication bus across all four stacked modules.

Steel-framed module with bolted guide rails

The first module consists of a welded rectangular structural steel cage fabricated from hollow square sections with pre-drilled corner splice plates. Cold-drawn T-section steel guide rails and stamped sheet-metal landing door frames are bolted to internal brackets at a 5-millimeter alignment tolerance before delivery. A mobile crane lowers the 3.2-meter-tall module into the pit, where base jacks level the frame prior to grouting.

Self-climbing crane hoisting upper modules

As upper floor slabs cure, an internal climbing derrick anchored to the topmost completed shaft wall lifts the second module from a ground-level staging bay. Guide rollers mounted on the exterior corners of the second module ride along temporary vertical angles inside the hoistway to damp swing during hoisting. Optical plumb targets on the lower module align the descending unit within 2 millimeters before high-strength structural bolts secure the splice flanges.

Cite aspatent.fyi, US 2026/0365486 A1, claim 1, first published 2026-11-23T00:46:45-05:00, https://patent.fyi/US20260365486/, SHA-256 8ccba9f260a84a28757573dc1ee35b8b7fa25a4a459882d1156fc3f7533e9585
First published
Permanent addresshttps://patent.fyi/US20260365486/
Content fingerprint (SHA-256)8ccba9f260a84a28757573dc1ee35b8b7fa25a4a459882d1156fc3f7533e9585
Methodv2026-11-18.2 · automated, not reviewed by a person
Correctionscorrections@patent.fyi