Section 1 · machine-generated

What if?

Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.

1.2External hoist during initial construction

What ifWhat if workers and materials are moved by an external rack-and-pinion construction hoist while the installed first-height modules remain static?
Claim language“operating the first elevator”

A temporary mast-climbing rack-and-pinion hoist mounted to the exterior facade carries personnel and materials to the lower floors during initial framing. The stationary modules inside the first-height hoist way remain locked in place with power disconnected while their guide rails and landing doors are aligned. Once the building reaches the second height, the internal modules are energized and commissioned for full hoistway service.

1.4Retractable deck without module separation

What ifWhat if the top module stays fastened to the lower module and retracts its hoisting platform to accept an upper extension?
Claim language“separating a first module”

Hinged steel beams supporting the traction sheave and drive motor unlock from the top module walls and pivot downward into a vertical storage recess. With the shaft opening clear, the upper module lands directly onto the top flange of the original top module without unbolting any existing structural joints. Once the upper module is bolted down, power and control cables are routed up through the open frame to a new drive unit at the top.

Section 2 · machine-generated

Variations

Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.

Other field of use

Modular mine shaft hoist extended during excavation

This arrangement applies the modular hoist structure to an underground vertical mine shaft during deep excavation. A lower shaft-collar module, stacked intermediate guide-rail cage modules, and a detachable headframe sheave module house a rock-mucking skip car. As excavation deepens the shaft, a surface winch lifts the headframe sheave module from the intermediate body, lowers a new intermediate guide-rail module onto the stack, and fastens the headframe sheave module back on top. The skip car then resumes hauling excavated rock across the extended shaft depth.

Component substitution

Hydraulic climbing jack system replacing crane module lifting

This arrangement replaces an external overhead crane with integrated hydraulic climbing jacks for separating and elevating the upper end module. Four synchronized double-acting hydraulic cylinders, mechanical locking pawls, and rack-toothed corner columns are mounted between the intermediate body and the upper end module. During height extension, quick-release tapered shear pins are withdrawn and the hydraulic cylinders push the upper end module upward by one module height while the pawls engage the column racks. An intermediate module slides laterally into the open gap and fastens to the intermediate body, after which the cylinders retract to seat the upper end module onto the new module.

Fiber-reinforced polymer composite frames replacing steel modules

This arrangement substitutes pultruded glass-fiber-reinforced polymer composite frame members and titanium quick-lock pins for welded structural steel bars and threaded bolts. Each module comprises pultruded composite box-section columns and crossbeams joined by bonded gusset plates, embedded stainless-steel guide-rail inserts, and spring-loaded locking pins. Reducing single-module mass by approximately 55 percent permits a lightweight roof davit or lower-capacity tower crane to lift the upper end module and insert intermediate modules at high elevations. Dedicated copper bonding straps bolted between adjacent guide-rail segments maintain electrical grounding continuity across the non-conductive composite frames.

Specific version of a part

Gearless permanent magnet traction cab drive

A gearless permanent magnet synchronous traction machine mounted on the top module drives grooved steel ropes over a cast-iron sheave to move the cab and counterweight within the first-height hoist way. A variable-frequency inverter regulates motor torque and speed between 1.0 and 2.5 meters per second based on load-cell signals under the cab floor. Mechanical wedge safety gears beneath the cab frame engage the T-section steel guide rails if overspeed occurs.

Pre-erected modular shaft tower extension

A tower crane lifts a braced structural steel shaft section onto the top of the existing concrete core walls and bolts its base flanges to embedded anchor plates. The steel shaft forms an enclosed second-height hoist way with pre-mounted guide rail brackets and landing door frames. Floor slabs and perimeter beams are poured around the steel shaft tower in subsequent construction phases.

Slip-formed concrete core wall extension

Hydraulic climbing jacks raise a steel formwork collar along embedded jacking rods to pour reinforced concrete core walls continuously above the first-height hoist way. Pre-positioned blockout boxes in the formwork cast recessed pockets for landing door headers and guide rail bracket anchors at each upper floor level. Once the concrete reaches 75 percent of its design compressive strength, the climbing rig advances to the next lift.

Cite aspatent.fyi, US 2026/0365487 A1, claim 1, first published 2026-11-23T00:46:45-05:00, https://patent.fyi/US20260365487/, SHA-256 e14cfb59da36980980dcd09eca1ce0631e504195a8c62e7f385077d10e9f95a5
First published
Permanent addresshttps://patent.fyi/US20260365487/
Content fingerprint (SHA-256)e14cfb59da36980980dcd09eca1ce0631e504195a8c62e7f385077d10e9f95a5
Methodv2026-11-18.2 · automated, not reviewed by a person
Correctionscorrections@patent.fyi