Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.
1.6Lifting the connected body by variable lengths
What ifWhat if the module connection body is lifted by a second, different length?
Claim language“by the first length”
A hydraulic strand jack system with programmable stroke sensors raises the module connection body by a custom height matching a taller lobby or mechanical floor module. Intermediate locking dogs engage notched rack bars on the shaft wall at the exact elevation of the next module. This allows modules of differing heights to be stacked and joined in sequence without altering the lifting rig.
1.2Intermediate floor opening for module entry
What ifWhat if the access opening is formed at an intermediate floor level of the hoist way?
Claim language“at the lowest end of the hoist way”
A structural opening is cast in the shaft wall at a mid-rise mechanical or podium floor adjacent to an exterior crane landing. Modules are hoisted by an exterior crane onto a cantilevered roller deck at that level and pushed horizontally into the shaft. Hydraulic jacks then lower or raise the modules within the shaft from that intermediate entry point.
Section 2 · machine-generated
Variations
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
Other field of use
Modular wind turbine tower assembly from ground level
A vertical tubular wind turbine tower is assembled inside a temporary support frame that surrounds a ground-level entry bay. A hydraulic jacking ring at the base of the frame lifts a first cylindrical tower section upward by one section height, leaving the entry bay clear. A second cylindrical tower section is rolled horizontally through the ground-level opening onto alignment rollers directly beneath the suspended first section. Bolted flange joints secure the upper and lower tower sections into a unified column before the jacking ring raises the combined assembly by another section height.
Automated or data-driven variant
Laser-guided alignment and automated torque fastening
Optical laser distance sensors and two-axis inclinometers mounted at the four corners of the lower module entry bay measure the lateral offset and tilt of each incoming module relative to the suspended column. A programmable logic controller receives the sensor coordinates at 50 hertz and drives four electro-hydraulic lateral actuators to align the mating flanges within a 0.5-millimeter tolerance. Once proximity switches confirm flange contact, pneumatic nutrunners integrated into the entry frame tighten the structural bolts to a target torque profile logged in a local database. The controller verifies that all load cells on the upper hoist show balanced tension before commanding the next vertical lift cycle.
Specific version of a part
Slip-formed reinforced concrete hoist way core
A self-climbing hydraulic slip-form rig pours a continuous reinforced concrete shaft wall as the building rises. Embedded steel weld plates are cast into the inner concrete faces at 3-meter vertical intervals to support guide rail brackets. Concrete compressive strength reaches at least 35 megapascals before lifting loads are applied to the shaft.
Steel-lintel framed ground-level access opening
A rectangular portal measuring 2.8 meters wide by 3.5 meters high is formed at the pit floor level using paired wide-flange steel lintel beams. Removable tubular steel cross-braces span the opening during concrete curing and are unbolted prior to module insertion. Once all modules are installed, precast concrete infill panels are bolted into the steel frame to seal the shaft.
Synchronized hydraulic strand jack lifting rig
Four hydraulic strand jacks mounted on a temporary steel header beam at the top of the hoist way grip seven-wire steel lifting strands attached to the first module. A central hydraulic power unit with proportional flow-divider valves raises all four corners at 150 millimeters per minute within a 2-millimeter tilt tolerance. Mechanical wedge locks inside each jack hold the module load statically whenever hydraulic pressure is released.
Tapered alignment pins with high-strength bolts
Conical hardened steel alignment pins protruding from the top corners of the second module enter matching chamfered sockets in the bottom frame of the first module. Four high-strength alloy steel hex bolts with lock washers are torqued to 450 newton-meters at each corner gusset plate to form a rigid structural splice. Guide rail sections between the two modules are joined simultaneously using machined tongue-and-groove fishplates.
Installing the shaft after building completion
Prefabricated steel shaft sections are bolted together along an exterior facade using tower cranes after the primary building floors are finished. Anchoring brackets fastened to floor slab edges transfer lateral wind and seismic loads into the completed frame. Wall penetrations at each landing are cut and framed with steel lintels to connect the shaft to existing corridors.
Steel-lintel reinforced concrete shaft opening
The access opening at the lowest end of the hoist way is formed in a reinforced concrete shear wall using a wide-flange structural steel lintel beam rated for the overhead wall load. Vertical steel jamb channels are anchored into the concrete edges with post-installed wedge anchors to protect the opening from impact during module insertion. After all modules are installed, precast concrete infill panels are bolted into the jamb channels and grouted flush.
Cite aspatent.fyi, US 2026/0365488 A1, claim 1, first published 2026-11-23T00:46:45-05:00, https://patent.fyi/US20260365488/, SHA-256 ffa8244d34e7d91805c4b188308f5f9458be739c1faab86f8d5dcfaa94e33893