1.1Side landing access opening for component removal
What ifWhat if the access opening is located in a side wall at a mid-level landing rather than at the top of the hoist way?
Claim language“at an upper end of a hoist way”
A structural wall opening at a mid-level floor connects to a cantilevered loading deck equipped with a rail-mounted transfer trolley. A winch anchored to the top slab suspends each disconnected component while a horizontal tugger pulls the suspended load sideways through the wall opening onto the deck. Guide rollers along the opening sill prevent contact with the shaft wall during lateral transfer.
1.1Horizontally offset roof access opening
What ifWhat if the upper access opening is positioned horizontally to the side of the hoist way?
Claim language“aligned with the hoist way in a vertical direction”
A roof opening sits adjacent to the hoist way footprint over an adjoining equipment bay equipped with a traversing overhead bridge crane. The crane lowers a rigid cantilevered spreader beam into the adjacent bay and translates horizontally along roof-mounted rails to position loads over the shaft centerline. A secondary guide chute directs hoist cables around a deflection sheave at the shaft edge.
1.4Top-down insertion of replacement modules
What ifWhat if the replacement components are lowered into the hoist way starting from the upper component and finishing with the lower component?
Claim language“starting from a lower component”
A temporary gantry at the top opening lowers the upper traction drive and suspension frame first, hanging them from temporary anchor beams just below the roof slab. Each subsequent lower module, including the car sling and platform, is lowered through a central pass-through bay in the upper frame or alongside it on offset guide rails and coupled from underneath. Hydraulic jacks on the pit floor then raise the completed stack to engage the permanent top mounts.
Section 2 · machine-generated
Variations
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
Other field of use
Vertical shaft replacement for underground mine hoists
A vertical mine shaft uses a removable steel collar hatch at the surface headframe aligned coaxially with the shaft guide rails. During cage replacement, a surface gantry crane disconnects and extracts worn skip assemblies from top to bottom through the collar hatch. Replacement modular skip sections are lowered in reverse order from the lowest counterweight frame up to the upper hoisting sheave assembly. Hydraulic locking pins secure each module to the shaft steelwork before the collar hatch is bolted shut.
Top-down module replacement for automated parking towers
An automated vertical parking structure includes a removable roof skylight frame directly above the central vehicle lift shaft. Maintenance crews unbolt and hoist out worn pallet-transfer carriages and vertical chain drives from the top level down to the ground pit. Replacement electric drive units, guide tracks, and steel pallet frames are lowered sequentially from the pit foundation upward to the top crown beam. Once hydraulic torque wrenches secure the stacked lift frames, a weatherproof insulated roof panel is lowered and clamped over the shaft opening.
Combination with existing systems
Rooftop crane integration with building structural monitoring sensors
A temporary jib crane mounted on the building roof connects to an existing structural health monitoring network embedded in the concrete core. Strain gauges and tiltmeters around the upper hoistway opening feed real-time load distribution data to the crane operator display during component extraction and insertion. When lateral wind loads or eccentric module weights exceed preset threshold values, an interlock system pauses hoist drum rotation until stabilizers are adjusted. After the final upper machine module is fastened, the structural sensors verify zero residual deflection before the roof hatch is sealed.
Automated or data-driven variant
Robotic winch guidance using depth cameras and lidar
An automated overhead winch system mounts a three-dimensional LiDAR scanner and stereo depth cameras around the upper hoistway opening to map internal shaft clearances. A control computer processes the point-cloud data to compute collision-free vertical trajectories for extracting old components from top to bottom. During insertion of the replacement modules, servo-actuated taglines and active damper winches automatically correct sway and rotational drift within a 2-millimeter tolerance. Optical alignment targets on each module confirm seating on the lower module before automated pneumatic wrenches fasten the joints.
Specific version of a part
Removable precast concrete roof hatch
A precast reinforced concrete slab panel with recessed lifting eyes sits over a steel-curbed opening directly above the hoistway centerline. Elastomeric compression gaskets line the curb perimeter to seal against weather and dust when the slab is seated. A mobile crane lifts the panel clear using four-leg wire rope slings before component removal begins.
Overhead gantry with load-cell hoist
A steel A-frame gantry straddles the upper hoistway opening and supports a variable-frequency electric chain hoist rated at 5,000 kilograms. An inline strain-gauge load cell monitors lifting tension while each upper drive, controller, and car-sling module is unbolted and raised vertically through the hatch. Wireless pendant controls allow an operator at the roof curb to match hoist speed to guide-shoe clearance.
Torque-controlled wedge anchors and fishplates
Galvanized steel rail brackets attach to concrete hoistway walls using expansion wedge anchors tightened to a specified torque with a calibrated wrench. Adjacent guide rail sections align via machined tongue-and-groove ends and bolt together across eight-hole steel fishplates with locking nuts. Shim packs of 0.5-millimeter and 1.0-millimeter stainless steel plates adjust rail plumbness within 1.5 millimeters over the shaft height.
Electric gantry hoist with load-cell rigging
A portable A-frame steel gantry straddles the roof opening and supports a variable-frequency electric chain hoist rated at five metric tons. Wireless tension load cells connected between the hoist hook and nylon lifting slings monitor component weight continuously as each upper and lower section is raised. Stabilizing taglines held from the roof deck prevent rotation of each withdrawn assembly as it clears the shaft.
Pre-wired modular steel car and frame
Factory-built galvanized steel car enclosure panels, aluminum door operators, and a pre-wired traction drive frame are staged on timber cribbing in an adjacent roof-level staging zone. Multi-pin quick-disconnect electrical harnesses and color-coded brake lines are bundled onto each module prior to hoisting. Pre-torqued alignment brackets on the structural frame match the existing hoist way rail spacing.
Expansion-anchor brackets with torque-controlled bolts
Galvanized steel wall brackets are anchored into the concrete hoist way walls using undercut mechanical expansion anchors installed with a calibrated rotary hammer. Each new guide rail and machine beam is bolted to the brackets with high-strength steel hex bolts, hardened flat washers, and prevailing-torque locknuts. A digital torque wrench tightens each fastener to a specified clamping torque, followed by thread-marking paint.
Section 3 · quoted from USPTO records
Other work
Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.
1.1providing an opening, at an upper end of a hoist way, aligned with the hoist way in a vertical direction, and disconnecting first elevator components constituting the elevator to be removed;
1.2sequentially withdrawing the first elevator components through the opening, starting from an upper component located in an upper portion of the elevator to be removed and ending with a lower component located in a lower portion of the elevator to be removed;
1.3preparing second elevator components constituting an elevator to be installed;
Each said prefabricated module 2, 3, 4 comprises guide rail sections 6 of the guide rail lines for guiding the car 5.
A · US 2025/0011133 A1 · ¶ 68
In this kind of modular solution, the modules can be prefabricated to high accuracy already at the factory, which makes the piling process very swift.
B · US 2025/0091837 A1 · ¶ 3
1.4sequentially introducing the second elevator components through the opening, starting from a lower component located in a lower portion of the elevator to be installed and ending with an upper component located in an upper portion of the elevator to be installed; and
1.5fastening the second elevator components.
Each said car guide rail section 6 is fixed on the tubular frame 10 with at least one fixing bracket 7.
A · US 2025/0011133 A1 · ¶ 68
In a preferred embodiment, the installation work comprises fixing on a module frame while it is in horizontal position one or more of: a hoisting machine unit comprising at least a hoisting machine and preferably also a car guide rail section, the hoisting machine preferably comprising drive sheave for engaging hoisting ropes and an electric motor for driving the drive sheave; and/or rope end fixing brackets.
B · US 2025/0091837 A1 · ¶ 29
An empty cell means only that no passage was reproduced there.
Why these two documents?
Both have a passage for 1.31.5. Both are classified in CPC B66B, as is this patent.
Additional background
Sentences reproduced word for word from these documents that state a problem, a purpose or benefit, a field of use, or an application or improvement.
A drawback has also been that accurate positioning of components has required lots of adjustment at the site.
A · US 2025/0011133 A1 · ¶ 3
Related claim parts: 1.31.5
Such modular solutions exist where the prefabricated modules comprise a pit module, a top module comprising a machinery for driving a hoisting roping, and one or more intermediate modules between the pit module and the top module.
B · US 2025/0091837 A1 · ¶ 3
Related claim parts: 1.31.5
An object is particularly to provide a solution which ensures an efficient and trouble-free installation with good ride comfort, while maintaining safe working practices.
A · US 2025/0011133 A1 · ¶ 7
Accuracy of fabrication of the modules can be improved with the method such that the work to be performed later at the construction site is simplified and reduced.
B · US 2025/0091837 A1 · ¶ 6
Thus, only small amount of time and work is needed at the construction site, which reduces disturbance caused on other operations taking place at the construction site and its surroundings.