United States Patent Application Publication

US 2026/0365490 A1

Published
Nov 19, 2026
Filed
Dec 29, 2025
Earliest date on the face
May 15, 2025
Classification
B66B 19/007
First published here
Nov 23, 2026

Generated automatically. Not reviewed by a person. Not legal advice or an opinion.

Section 1 · machine-generated

What if?

Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.

1.4Retaining and re-aligning existing guide rails

What ifWhat if the existing steel guide rails and shaft brackets stay mounted in the hoistway for reuse?
Claim language“withdrawing remaining first elevator component”

Technicians inspect the existing T-section steel guide rails for straightness, surface wear, and bracket torque using plumb lines and laser gauges. Shims are inserted between the rail brackets and shaft walls to bring rail-to-rail gauge tolerances within 1.5 millimeters. Rail joints are dressed with a portable grinder and cleaned with solvent so the new car roller guides run smoothly.

1.6Cast-in-place concrete machine room slab

What ifWhat if the new machine room floor is poured as a cast-in-place concrete slab using formwork suspended from the shaft walls?
Claim language“introducing the machine room floor through the opening”

Steel deck panels and perimeter angle irons are carried through the building interior and anchored to the upper hoistway walls to form a rigid mold. Reinforcing steel bars are tied in a grid above the decking, leaving rectangular blockouts for rope and cable passages. Concrete is pumped through a flexible hose from street level to fill the form to a thickness of 150 to 200 millimeters.

1.7Hoistway-mounted drive and control equipment

What ifWhat if the new traction drive and control cabinet mount directly onto the upper guide rails inside the hoistway?
Claim language“components to be disposed in the machine room”

A gearless permanent-magnet synchronous motor attaches to a structural bracket bolted to the top sections of the main car guide rails. The motor controller and power inverter sit inside a narrow steel cabinet recessed into the upper hoistway wall beside a landing frame. Electrical power and signal cables route vertically along the shaft wall, eliminating active machinery above the top slab.

Section 2 · machine-generated

Variations

Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.

Other field of use

Vertical shaft replacement of mine hoist machinery

A mine shaft headframe incorporates a removable roof hatch aligned vertically with the main hoisting compartment. Existing winding drums, sheave wheels, and headframe guide rails are unbolted and lifted upward through the roof hatch using a mobile lattice-boom crane. A pre-assembled steel deck plate forming the machinery platform is extracted through the hatch, followed by the vertical extraction of lower shaft guides and conveyance cages. After lower guide sections and a replacement skip are lowered and bolted into the shaft, the replacement deck plate and winding equipment are lowered through the hatch and secured before sealing the roof hatch.

Component substitution

Modular composite floor panels for machine rooms

A segmented fiber-reinforced polymer deck replaces a monolithic reinforced concrete machine room floor slab during shaft refurbishment. The deck consists of interlocking pultruded beams and bolted composite panels sized to pass through the upper hoist way opening without cutting or demolition. After the existing machinery is lifted out through the upper opening, each composite panel is unbolted from its perimeter steel ledger angles and hoisted out individually. During reassembly, the replacement composite panels are lowered through the opening, bolted to the ledger angles, and sealed along the joints with elastomeric gaskets before installing the new drive machinery.

Hydraulically actuated folding hatch for permanent closure

A twin-leaf steel folding hatch driven by double-acting hydraulic cylinders replaces removable precast concrete roof panels for closing the upper hoist way opening. The hatch leaves hinge along opposite steel curb beams around the opening and incorporate perimeter compression seals and mechanical locking pins. During replacement operations, the hydraulic power unit retracts the locking pins and pivots both leaves to a 95-degree vertical position to clear the crane lifting envelope. Upon completion of machine room reinstallation, the cylinders lower the leaves flush onto the curb beams and engage the locking pins to isolate the machine room from the exterior environment.

Parameter or scale variation

Multi-section opening for high-rise heavy-duty shafts

For hoist ways exceeding 150 meters in vertical rise and carrying loads above 4,000 kilograms, the upper opening spans 3.5 meters by 4.0 meters and is framed by twin 300-millimeter wide-flange steel headers. The machine room floor is divided into four equal steel-framed cassettes, each weighing 1,200 kilograms, to remain within the 2,500-kilogram lifting capacity of a rooftop derrick crane at a 12-meter radius. Withdrawal and insertion of shaft guide rail bundles proceed in 5-meter vertical increments at a hoisting speed of 0.15 meters per second. Temporary wind-bracing struts rated for 45 meters per second gusts lock into the header frame while the opening remains uncovered.

Combination with existing systems

Integrated temporary gantry crane and weather enclosure

A collapsible gantry crane rail system mounts directly onto the structural perimeter beams surrounding the upper hoist way opening and connects to a retractable fabric weather enclosure. While the opening is uncovered, the motorized gantry trolley translates horizontally across the shaft centerline to lift old drive sheaves, floor slabs, and guide rails directly onto an adjacent roof staging platform. The retractable enclosure deploys over the gantry frame via tensioned guide cables to block rain and wind from entering the open machine room and hoist way during non-working hours. Once the replacement machine room floor and drive components are bolted in place, the gantry rails are unpinned and a permanent insulated roof hatch closes the opening.

Automated or data-driven variant

Laser-guided crane positioning and load-sway damping

A terrestrial laser scanner mounted at the upper opening maps the hoist way walls, machine room floor perimeter, and structural anchor points into a three-dimensional point cloud before disassembly begins. A programmable logic controller uses the point-cloud coordinates to compute collision-free lifting trajectories for withdrawing the old machinery, floor sections, and shaft components through the opening. Inertial measurement units and strain-gauge load cells attached to the crane hook feed real-time sway angle and tension data at 100 hertz to an active winch-trolley damping algorithm. The controller automatically adjusts trolley acceleration to keep lateral load swing within 15 millimeters of the shaft centerline during vertical extraction and insertion.

Specific version of a part

Vertical lowering down the hoistway shaft

A portable electric winch rigged to a temporary steel A-frame inside the machine room lowers disassembled motor and sheave assemblies through the existing rope slots or a widened slab cutout. Guide ropes stabilized at the pit floor prevent the suspended load from swinging against the shaft walls during descent. At the ground-floor landing, a pallet jack receives the components through the open hoistway doors.

Diamond wire-sawed roof slab opening

A diamond-impregnated wire saw driven by a hydraulic power pack cuts a rectangular opening through the reinforced concrete roof slab directly above the hoistway. Steel lifting eyes anchor into drilled holes in the cut concrete block so a mobile crane lifts the severed slab section away in one piece. The cut perimeter aligns within 10 millimeters of the inner hoistway walls to provide unobstructed vertical access.

Expansion-anchored galvanized steel rail brackets

Galvanized steel L-brackets attach to the concrete hoistway walls using mechanical wedge expansion anchors torqued to 80 newton-meters. Slotted mounting holes on the brackets allow horizontal adjustment of the T-section steel guide rails before final tightening. Clip-type rail fasteners clamp the rail flanges to the brackets at vertical intervals of 2.5 meters.

Precast steel-framed composite floor module

A prefabricated floor module consists of a welded wide-flange steel perimeter frame supporting a 12-millimeter checkered steel plate deck with pre-cut rope slots. A tower crane lowers the module through the upper opening onto steel corbels bolted to the upper hoistway walls. Elastomeric isolation pads placed between the module frame and the wall corbels reduce structure-borne vibration.

Insulated precast concrete roof closure panel

A crane lowers a precast concrete roof panel with an integrated rigid foam insulation layer onto the perimeter curb of the upper opening. Stainless steel L-angles bolt the panel to embedded weld plates in the existing roof slab. A two-part polyurethane sealant fills the perimeter joint, followed by a torch-applied elastomeric waterproofing membrane lapped 150 millimeters onto the surrounding roof.

Cite aspatent.fyi, US 2026/0365490 A1, claim 1, first published 2026-11-23T00:46:45-05:00, https://patent.fyi/US20260365490/, SHA-256 449419f80a60f2bd94d4687d67677a7a671c9d6c29b7945a998e90b87a44b806
First published
Permanent addresshttps://patent.fyi/US20260365490/