1.1Open hole stimulation interval
Two expandable packer elements seal against the borehole wall above and below the treatment interval. A port between the packers directs fluid into the exposed formation.
Generated automatically. Not reviewed by a person. Not legal advice or an opinion.
Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.
Two expandable packer elements seal against the borehole wall above and below the treatment interval. A port between the packers directs fluid into the exposed formation.
A casing collar locator aligns the assembly with a reference collar. Rigid spacer subs between perforating modules establish the axial spacing, and each module perforates the casing at its installed offset.
A surface injector advances continuous steel tubing and the attached assembly through the casing. A hydraulic setting tool uses pressure supplied through the tubing to set the plug, and a separate pressure-actuated mechanism initiates perforation.
The perforating tool opens the selected intervals and returns to the surface while the set plug remains downhole. A separate tubing string then delivers acid through an outlet near the perforations, and the timing keeps the perforating assembly out of contact with the acid.
Tubing places an aqueous aminopolycarboxylate salt solution across the perforated interval at an initial pH near 7. The dissolved chelant binds calcium released from reactive cement fragments during a soak, and a subsequent flush carries soluble calcium complexes and loose fines from the interval.
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
A cemented steel casing crosses two planned injection intervals in a geothermal well. A wireline assembly carries a retrievable bridge plug and a perforating tool below a water spacer, which separates the assembly from an acid column in contact with the casing and wireline. The tool opens the deeper interval first, and a surface pump displaces acid to the openings to dissolve acid-soluble cement debris. The tool moves up to open the second interval, where the pump repeats the acid placement before tool retrieval.
A filtered brine thickened with hydroxyethyl cellulose replaces the plain water spacer. The pump places the brine around the wireline above the plug and perforating tool, then places the acidic composition above the brine. The brine increases spacer viscosity and slows interfacial mixing during placement. After each perforation, the pump advances the spacer and brings acid into contact with the new openings and cement debris.
Three target depths are spaced 6 m apart, and the plug sits 10 m below the deepest target. A wireline carries an independently fired three-section perforating tool beneath a pumped water spacer and acid column. The tool creates one perforation area at each target, moving from the deepest to the shallowest. After each firing, the pump displaces acid to the active interval and holds it there for 5 minutes before the tool moves.
A pressure-control head seals around the moving wireline, and a side-entry manifold below the head connects separately valved spacer and acid pumps to the casing bore. Check valves on the pump branches prevent reverse flow between the branches. With the plug and perforating tool suspended in the casing, the pumps place the spacer and then the acid through the same side entry while the wireline moves independently through the head. The pumps advance acid to each perforation area after firing, and a pressure-rated lubricator receives the tool during retrieval.
A magnetic casing collar locator mounts above the perforating tool and sends collar signals to a surface controller through the wireline. The controller matches the measured collar spacing to a stored casing tally and applies the measured offset between the locator and the perforating section. It stops the winch at each programmed target and enables the firing circuit when the corrected depth lies within the configured tolerance and the tool is stationary. The operator fires the tool and initiates acid displacement after the controller records the firing signal.
An acid-resistant conductivity probe and a temperature sensor mount on the wireline at a fixed offset above the perforating tool. The surface controller stores temperature-corrected conductivity ranges measured for the spacer and acidic composition before pumping. After each perforation, the probe is positioned at the perforation depth, and the controller advances fluid until conductivity remains in the acid range for a programmed interval. The controller then switches the pump to the programmed treatment rate and records the volume delivered after acid arrival.
The first run carries a plug and a setting tool that anchors the plug below the treatment interval. After the setting tool returns to the surface, the second run carries the perforating tool to the selected depths above the plug.
Threaded steel casing joints form a continuous string through the treatment interval. Cement slurry fills the annulus around the string and hardens against the casing and borehole wall.
Gamma ray and casing collar logs correlate formation intervals with measured depths in the cased well. The assessment selects two perforation locations within the target intervals and records their offsets from nearby casing collars.
An armored electric wireline supports a bottom hole assembly with a bridge plug below a selectively initiated perforating tool. Separate electrical commands set and release the plug, then activate perforating modules at successive depths.
A surface pump injects a measured volume of filtered water ahead of the acidic composition. The pump operator sizes the water volume from the free casing cross-sectional area and the desired axial separation between the acid front and the assembly.
Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.
In the illustrated embodiment, a surface casing 30 has been cemented to the walls 28 of the wellbore 24 by cement sheath 32.A · US 2015/0322327 A1 · ¶ 40
A method of treating a subterranean formation includes providing a plurality of cased wellbores penetrating a subterranean formation, where the plurality of cased wellbores is fluidly connected with a common treatment fluid source.B · US 2016/0326853 A1 · abstract
In sequential fracturing, after two or more parallel wells are drilled and cased, perforation and treatment are conducted at alternate intervals along the well bores.B · US 2016/0326853 A1 · ¶ 37
Tool strings 202 and 204 are moved into cased wellbores 124 and 126, respectively, and tools 206 and 208, conveyed on tool strings 202 and 204, are positioned adjacent to subterranean formation areas of interest 210 and 212. Tools 206 and 208 may include perforation guns, hydrojets, or any suitable device known in the art, to perforate wellbore casings 214 and 216, thus creating fluid passageways 218 and 220 in the casings (two shown in each casing).B · US 2016/0326853 A1 · ¶ 28
A method comprising: injecting a non-cementitious spacer fluid comprising sugar cane ash and water; displacing a drilling fluid in a wellbore with the spacer fluid; wherein the spacer fluid is essentially free of a cement set activator.A · US 2015/0322327 A1 · claim 1
Once fractures 222 and 224 are created and while remaining under fluid pressure adequate to maintain the open fractures, proppant may be added to the treatment fluid and thereafter introduced into the open fractures to help ensure the fractures remain open after the treatment operation is concluded and the wellbores begin producing formation fluid. Alternatively, acid can be used to etch the fracture faces in and ensure that the fractures remain open in carbonate formations.B · US 2016/0326853 A1 · ¶ 28
An empty cell means only that no passage was reproduced there.
Only Document A has a passage for 1.4. Only Document B has a passage for 1.2 1.3 1.5. Both have a passage for 1.1.
Sentences reproduced word for word from these documents that state a problem, a purpose or benefit, a field of use, or an application or improvement.
The casing may also be cemented in place, sealing the annulus between the casing and the earthen formation.B · US 2016/0326853 A1 · ¶ 3
Related claim parts: 1.4
The spacer fluids may enhance solids removal while also separating the drilling fluid from a physically incompatible fluid, such as a cement composition.A · US 2015/0322327 A1 · ¶ 3
Spacer fluids may also be placed between different drilling fluids during drilling change outs or between a drilling fluid and completion brine.A · US 2015/0322327 A1 · ¶ 3
The field to which the disclosure generally relates to is stimulation operations conducted through a wellbore to improve the flow of production fluid from a surrounding formation into the wellbore, and in particular multi-stage multiple wellbore stimulation for enhancing fluid production from the surrounding formation.B · US 2016/0326853 A1 · ¶ 1
However, multi-stage fracturing techniques suffer from one or more drawbacks, such as difficulty in controlling fracture placement, long cycle times between stages (e.g. to run tools into the hole), and/or limitations on treatment execution such as the order of treating several intervals of a subterranean formation successively.B · US 2016/0326853 A1 · ¶ 6
patent.fyi, US 2026/0365913 A1, claim 1, first published 2026-11-23T18:24:18-05:00, https://patent.fyi/US20260365913/, SHA-256 480c7aaa429cb47cea5ba474c7fd180b0a4ad9e9e2a0d223288d530c33ccd828