Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.
1.1Pressurized flexible hose replaces first wall
What ifWhat if a pressurized flexible hose delivered joint filler directly into the tile joint without a first lateral section?
Claim language“a first lateral section”
A single flat guide blade rides along one tile edge while a flexible delivery hose terminates at the base of the blade. A low-pressure diaphragm pump pushes mixed grout through the hose directly into the joint space. The single blade strikes off excess material flush with the tile surface as the tool advances.
1.2Parallel vertical walls form rectangular chute
What ifWhat if the second lateral section were parallel to the first lateral section rather than positioned at an angle?
Claim language“positioned at an angle”
Two parallel vertical walls spaced 15 mm to 30 mm apart form a narrow rectangular chute above the tile joint. A weighted plunger pushes the joint filler downward between the parallel walls toward the bottom opening. This vertical feed forces thick cementitious grout into the joint without relying on sloped surfaces.
1.2Flat horizontal tray with helical auger
What ifWhat if the lateral sections formed a flat horizontal tray with a rotating helical auger rather than a V-shaped trough?
Claim language“a V-shaped trough”
A horizontal sheet-metal tray holds a batch of joint filler material on a flat bed above the tile surface. A hand-cranked helical auger rotates along the tray floor to convey the paste laterally toward a discharge port. The auger maintains a steady volumetric feed rate into the joint across varying paste viscosities.
1.3Linear row of circular dispensing nozzles
What ifWhat if a linear row of discrete circular nozzles dispensed the joint filler?
Claim language“a slot”
A manifold bar along the bottom of the trough contains a row of 4 mm diameter circular bores spaced at 10 mm intervals. Joint filler material passes through the individual bores as discrete beads that coalesce inside the tile joint under gravity and forward motion. The spaced bores restrict flow rate for low-viscosity epoxy grouts and prevent flooding over narrow joints.
1.3Side-wall opening discharges filler laterally
What ifWhat if the discharge opening were located on a vertical side wall above a closed trough floor?
Claim language“positioned at a bottom”
The bottom of the trough is sealed with a solid apex plate, and a longitudinal discharge port is cut into the lower portion of one lateral wall. A spring-loaded wiper blade inside the trough sweeps paste sideways through the wall port as the pan slides along the joint. Placing the port on the side wall directs filler horizontally against the vertical edge of an adjacent tile.
Section 2 · machine-generated
Variations
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
Other field of use
V-shaped funnel trough for asphalt crack sealing
A V-shaped trough constructed from two angled steel plates holds heated asphalt-rubber sealant above a pavement crack. The two plates converge at a 60-degree included angle toward a bottom longitudinal slot measuring 8 millimeters in width. A pair of steel skid plates welded to the exterior bottom flanks slides along the asphalt surface to keep the slot centered over the crack. As an operator pushes the trough forward, gravity feeds the molten sealant through the slot directly into the pavement void without coating the surrounding road surface.
Component substitution
Flexible silicone walls with adjustable hinge joint
Two lateral panels molded from platinum-cured silicone elastomer replace rigid metal or plastic walls in the V-shaped trough. The lower edges of the silicone panels connect to a stainless-steel piano hinge running along the trough base, with a setscrew clamping mechanism at each end. Loosening the setscrews allows the included angle between the lateral panels to vary between 35 degrees and 75 degrees, which alters the width of the bottom dispensing slot. When filled with cementitious grout, the compliant silicone walls flex inward under light hand pressure to force thick paste through the slot.
Parameter or scale variation
Micro-slotted hopper for narrow mosaic tile joints
A scaled-down V-shaped pan measures 120 millimeters in length and 65 millimeters in height for use with closely spaced glass mosaic tiles. Two polycarbonate side walls meet at a 40-degree angle above a bottom slot that narrows to 1.5 millimeters in width. The trough holds up to 150 milliliters of fine-aggregate epoxy grout formulated with silica sand particles smaller than 0.2 millimeters. A tapered brass guide fin extends 2 millimeters below each side of the slot to ride inside a 1.5-millimeter tile joint and prevent lateral drift during linear passes.
Combination with existing systems
Vibratory feeder attachment for stiff mortar placement
An electric eccentric-mass micro-vibrator bolts to the outer face of one lateral panel of the V-shaped trough. Rubber isolation mounts sit between the trough frame and an upper handle bar so high-frequency oscillations remain localized to the angled walls. When powered by a 12-volt battery pack, the vibrator oscillates the trough at 80 hertz to lower the apparent viscosity of low-slump mortar inside the pan. The fluidized mortar flows continuously downward through the bottom slot into vertical or horizontal masonry joints without bridging above the opening.
Pressurized cartridge manifold feeding a v-shaped trough
A pneumatic caulking gun manifold connects via a flexible polyurethane hose to a rigid distribution tube mounted along the upper interior of the V-shaped trough. The distribution tube contains a row of 4-millimeter perforations spaced every 25 millimeters along its length to deposit joint filler evenly across the angled side walls. A pressure regulator maintains a constant 200-kilopascal air supply to the cartridge, replenishing the trough at the same rate that material exits the bottom slot. This continuous feed arrangement eliminates manual refilling stops during long linear joint runs.
Automated or data-driven variant
Optical joint tracking with motorized gate valve
A downward-facing line-scan camera mounted ahead of the V-shaped trough captures surface contrast images of the tile grid as a wheeled carriage advances. An embedded microcontroller processes the image rows to detect the centerline of the open joint and drives a stepper-motor linear actuator connected to the trough carriage to keep the bottom slot aligned within 0.3 millimeters. A second servo-actuated sliding shutter sits beneath the bottom slot and modulates the opening aperture based on encoder-measured travel speed. When the camera detects a perpendicular cross-joint or the end of a tile row, the controller closes the shutter to stop material flow.
Specific version of a part
Vibratory plate drives filler through slot
A battery-powered eccentric-mass vibrator is bolted to the outer face of the trough and oscillates at 50 Hz to 120 Hz. The high-frequency vibration liquefies thixotropic grout and drives it downward through the bottom slot into the tile joint. This mechanical agitation allows stiff, low-slump mortar to flow evenly through the opening.
Polished stainless steel lateral wall
The first lateral section is stamped from 1.5 mm thick 304 stainless steel sheet with an electropolished inner face to reduce friction with cementitious grout. A rolled top lip along the upper edge provides structural rigidity and a smooth grip surface for the operator. The lower edge is laser-cut to a straightness tolerance of 0.2 mm to maintain a uniform joint edge.
Adjustable sliding gate over bottom slot
A slotted stainless steel slider plate sits flush against the underside of the V-shaped trough and translates laterally along guide pins. Moving the slider plate varies the effective slot width continuously from 2 mm to 12 mm to match narrow ceramic joints or wide stone joints. A knurled thumbscrew locks the plate at the selected opening width during application.