patent.fyi
Applications  /  US 2026/0366765
United States Patent Application Publication

US 2026/0366765 A1

Published
Nov 19, 2026
Filed
May 11, 2026
Earliest date on the face
May 14, 2025
Classification
F24T 10/15
First published here
Nov 23, 2026

Generated automatically. Not reviewed by a person. Not legal advice or an opinion.

Section 1 · machine-generated

What if?

Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.

1.1Excavated open trench ground cavity

What ifWhat if the ground opening is an excavated trench formed by a bucket excavator?
Claim language“hole that has been drilled”

A trenching bucket or chain trencher cuts a continuous slot 1.5 to 2.5 meters deep into the soil. The fluid tube lies horizontally along the trench floor, and dry backfill surrounds the tube before soil covers the trench. Heat exchanges between the buried tube and the surrounding shallow earth.

1.2Solid metal thermal conductor rod

What ifWhat if a solid thermally conductive metal rod is lowered into the drilled hole?
Claim language“a fluid tube”

A solid copper or aluminum rod extends down the length of the borehole and connects at the ground surface to a fluid-carrying heat exchanger block. Heat moves along the metal rod by solid-state thermal conduction between the surrounding dry filler material and the surface heat exchanger. No fluid circulates below grade, eliminating subsurface pipe joints and pressure-testing steps.

1.3Wet cementitious slurry grout mixture

What ifWhat if a wet pumpable slurry fills the annular space in the hole?
Claim language“a dry filler material”

Water, hydraulic cement, and silica sand are blended in a surface paddle mixer until the mixture reaches a pumpable viscosity. A positive-displacement mud pump drives the liquid slurry down a tremie pipe from the bottom of the hole upward, displacing groundwater and air. The slurry cures into a solid, low-permeability thermal bridge between the fluid tube and the borehole wall.

1.3Gravity-fed dry granular pouring

What ifWhat if gravity alone feeds the dry granular material down the introduction tube?
Claim language“using compressed air to propel”

A conical surface hopper positioned directly above the borehole feeds dry, free-flowing silica sand into the open top of a rigid introduction pipe. A pneumatic or electric vibrator clamped to the upper end of the pipe agitates the sand column to prevent bridging inside the bore. As sand exits the bottom of the pipe, operators raise the pipe incrementally while maintaining a continuous head of sand inside.

1.4Permanent sacrificial introduction tube retention

What ifWhat if the introduction tube remains permanently buried inside the drilled hole?
Claim language“removing the introduction tube”

A thin-walled perforated metal or polymer introduction tube stays in place after delivering the dry filler material around the fluid tube. Slots along the wall of the abandoned introduction tube allow dry sand and bentonite to settle outward and contact both the fluid tube and the borehole wall. Leaving the tube in the ground supports unstable borehole walls against collapse and eliminates extraction rigging.

Section 2 · machine-generated

Variations

Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.

Other field of use

Pneumatic backfilling for buried high-voltage cable conduits

A borehole or trench receives an electrical conduit housing high-voltage power cables alongside a sacrificial pneumatic delivery pipe. Compressed air propels a dry thermal backfill composed of quartz sand and graphite flakes through the delivery pipe to fill the annular space around the conduit. As the backfill reaches the top of the conduit zone, the delivery pipe is withdrawn to leave a dense, void-free mineral bed. The compacted dry medium conducts resistive heat away from the buried cables into the surrounding soil to maintain conductor ampacity.

Component substitution

Graphite-enhanced silica powder propelled by nitrogen gas

A dry mixture of fine silica sand and expanded natural graphite powder replaces pure sand and bentonite as the borehole filler material. Pressurized dry nitrogen gas from a portable tank replaces atmospheric compressed air as the carrier fluid in the introduction tube. Because nitrogen contains minimal moisture, the powder flows through the introduction tube without clumping or prematurely hydrating during pneumatic transport. Once placed around the heat exchanger loop and the introduction tube is extracted, the graphite-silica bed provides higher thermal conductivity than standard mineral sand.

Flexible coiled tubing used for dry filler delivery

A continuous length of abrasion-resistant polyurethane-lined coiled tubing replaces rigid segmented pipe as the introduction tube. The coiled tubing feeds off a powered reel mounted on a surface trailer directly into the borehole alongside the geothermal fluid tube. Using continuous coiled tubing eliminates threaded or coupled joints that restrict internal flow or snag on the borehole wall during extraction. After the dry filler fills the borehole to the target elevation, the powered reel winds the tubing back onto the spool in a single uninterrupted motion.

Parameter or scale variation

Deep borehole installation with staged pressure increments

The drilled borehole extends to a depth between 150 and 250 meters with a diameter of 125 millimeters, accommodating a dual U-bend fluid tube assembly. As the introduction tube is retracted upward in 10-meter intervals, a regulator steps the compressed air supply down from 800 kilopascals at the borehole bottom to 250 kilopascals near the surface. Lowering the air pressure in proportion to the remaining overburden depth prevents blowout of the dry filler at shallow depths while maintaining sufficient velocity to clear the delivery line. A rotary airlock feeder meters the dry filler blend at a constant rate of 15 kilograms per minute throughout the retraction.

Combination with existing systems

Integration with a closed-loop heat pump manifold

Multiple fluid tubes installed in adjacent boreholes using pneumatic dry backfilling connect at the surface to a buried header manifold equipped with isolation ball valves and flow-balancing meters. The manifold feeds a reversible water-to-water heat pump connected to a building hydronic radiant floor network. During installation, a vacuum dust collector couples to a sealed collar at the borehole mouth to capture airborne fines displaced by the compressed air stream. After the introduction tube is removed from each borehole, the fluid tubes are purged with an antifreeze water-glycol mixture and pressure-tested before coupling to the heat pump.

Automated or data-driven variant

Sensor-guided pneumatic filling with automated tube retraction

A motorized winch withdraws the introduction tube from the borehole at a rate controlled by a microcontroller receiving signals from a downhole acoustic level sensor and a mass-flow meter on the compressed air line. The acoustic sensor measures the height of the rising dry filler column inside the borehole annulus and maintains the outlet of the introduction tube 0.3 meters above the filler surface. When line backpressure exceeds a threshold indicating a partial blockage, the controller pulses a pneumatic vibrator on the feeder hopper and temporarily increases airflow. The controller logs the cumulative mass of filler delivered per meter of borehole depth to verify uniform annular packing.

Specific version of a part

Rotary air-percussion rock borehole

A truck-mounted rotary drill rig drives a down-the-hole pneumatic hammer bit to bore a vertical shaft 125 millimeters in diameter and 100 meters deep through consolidated bedrock. Compressed air exhausted through the bit flushes rock cuttings up the annulus to a surface cyclone separator. A temporary steel surface casing lines the upper 6 meters of loose overburden to keep the collar open.

High-density polyethylene u-bend loop

Two parallel lengths of 32-millimeter high-density polyethylene pipe join at the bottom via a thermally fused 180-degree return fitting to form a continuous U-bend circuit. A cast-iron weight attaches to the bottom return fitting to overcome buoyancy if groundwater stands in the borehole. Spacer clips snapped along the vertical legs every 3 meters keep the supply and return pipes separated.

Pneumatic hopper with rotary airlock

A pressurized steel blow-pot hopper holds a pre-blended mixture of 70 percent silica sand and 30 percent granular sodium bentonite by weight. A motorized rotary airlock valve meters the dry blend into a 400-kilopascal compressed-air stream flowing through a 38-millimeter flexible hose connected to a rigid steel introduction pipe. Air velocity carries the suspended particles down to the bottom of the borehole while air vents upward through the annulus.

Incremental hydraulic hoist pipe extraction

A hydraulic winch and mast-mounted clamp lift the rigid steel introduction tube in 1.5-meter increments as dry sand and bentonite accumulate around the fluid tube at the bottom of the borehole. Operators monitor backpressure on the compressed-air manifold and maintain the discharge tip 0.5 to 1.0 meter above the rising filler level. Once the filler reaches the top of the borehole, the entire introduction tube clears the collar, leaving the compacted dry medium in direct contact with the fluid tube and earth.

Section 3 · quoted from USPTO records

Other work

Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.

Document AUS 2016/0123096 A1
Published
May 5, 2016
Filed
Nov 3, 2015
Class
E21B 21/065
Document BUS 11,760,034 B2
Published
Sep 19, 2023
Filed
Jan 14, 2022
Class
B29C 66/5221
Claim 1
Document A
Document B
1.1providing a hole that has been drilled into the ground;
In an exemplary embodiment, boreholes 102a are shown as vertical boreholes drilled or formed from the surface 101 through the overburden 104 and into the ore field 106.
A · US 2016/0123096 A1 · ¶ 16
Current trenchless pipe replacement methods preferably utilize a borehole, with a pit at one or both ends, through which the pipe is pushed or pulled to create a close tolerance annular space around the pipe reduces air voids, soil settlement and pipe movement after installation is complete.
B · US 11,760,034 B2 · ¶ 2
1.2positioning a fluid tube into the drilled hole;
A drilling fluid 232 is supplied from the surface into the tubular 212, which fluid discharges at the bottom of the drill bit 220 and returns to the surface via annulus 214 between the drill string 228 and the borehole 202.
A · US 2016/0123096 A1 · ¶ 19
1.3introducing a dry filler material including one or more of sand and bentonite into the hole by using compressed air to propel the dry filler material through an introduction tube positioned in the hole; and
1.4removing the introduction tube from the drilled hole, wherein the dry filler material positioned around the fluid tube facilitates heat transfer between the earth and the fluid tube, thereby improving heat transfer between a fluid to be contained within the fluid tube and the earth.

An empty cell means only that no passage was reproduced there.

Why these two documents?

Only Document A has a passage for 1.2. Both have a passage for 1.1.

Additional background

Sentences reproduced word for word from these documents that state a problem, a purpose or benefit, a field of use, or an application or improvement.

Many high quality ore bodies are located at depths at which traditional mining methods, such as removal of overburden to extract the ore or creating mine stopes and shafts and using mining equipment or deploying humans are not feasible due to harsh environment or not economical to build open pits or underground mines.
A · US 2016/0123096 A1 · ¶ 5
In one aspect, the disclosure provides a method of extracting ores from a subsurface location or an ore deposit without removing the overburden.
A · US 2016/0123096 A1 · ¶ 7
Also, current designs for pipe joints require long areas to assemble the pipes together, with repeated handling of the pipes, which adds to the labor costs and cost of excavations.
B · US 11,760,034 B2 · ¶ 3
A further problem with current pipe technology is that the manufacturer has to make and stock pipes for different applications, depending on the fluid or liquid material to be carried or passed through the pipe, and/or corresponding to internal pipe pressures.
B · US 11,760,034 B2 · ¶ 5
Cite aspatent.fyi, US 2026/0366765 A1, claim 1, first published 2026-11-23T03:43:43-05:00, https://patent.fyi/US20260366765/, SHA-256 c19816d232af9937ea88462c168a1c3ce9feb58fed7c0dc42823f6057c3ef37d
First published
Permanent addresshttps://patent.fyi/US20260366765/
Content fingerprint (SHA-256)c19816d232af9937ea88462c168a1c3ce9feb58fed7c0dc42823f6057c3ef37d
Methodv2026-11-18.2 · automated, not reviewed by a person
Correctionscorrections@patent.fyi