Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.
1.1Active current limiter replacing series resistor
What ifWhat if an active current-limiting transistor coupled the device under test to the input terminal with no series resistor?
Claim language“a resistor coupled in series”
A constant-bias field-effect transistor operates in its saturation region to cap current flow once dielectric breakdown occurs. During normal stress prior to breakdown, the transistor channel exhibits low resistance and passes the full stress voltage to the dielectric. After breakdown, the transistor pinches off and clamps the fault current at a fixed level such as 50 microamperes, preventing the shared supply rail from drooping.
1.1Linear bus topology replacing matrix array
What ifWhat if the test unit circuits formed a single linear bank addressed by a shift register?
Claim language“arranged in rows and columns”
Each test unit circuit connects to one common stress bus and one common sense bus, while a serial shift register passes an enable token from one cell to the next. A single clock signal advances the token bit through flip-flops positioned adjacent to each cell, activating one second switch at a time for readout. This linear organization eliminates row and column decoders and reduces routing overhead along one axis of the test die.
1.2Local comparators driving first switch gates
What ifWhat if local voltage comparators inside each cell drove the first switches with no plurality of first test lines?
Claim language“a plurality of first test lines”
A comparator powered by the cell supply monitors the potential on the output-enable line against an internal reference threshold. When the cell is not selected for measurement, the comparator asserts a logic high signal to close the first switch and clamp the intermediate node to the reference voltage. During readout, the comparator releases the first switch so current flows solely through the second switch to the output terminal.
1.3Continuous metal plane supplying stress voltage
What ifWhat if a continuous upper-layer metal plane contacted every input terminal directly with no plurality of second test lines?
Claim language“a plurality of second test lines”
A solid copper or aluminum sheet in an upper metallization layer covers the entire array and drops vertical vias directly down to each input terminal. This planar bus distributes the high-voltage stress bias uniformly across all cells with minimal parasitic series resistance and negligible voltage-drop skew between columns. Individual cell isolation during readout remains governed by the first and second switches within each test unit circuit.
1.5Independent column drivers for first lines
What ifWhat if each first test line connected to an independent column-select driver so the lines remained electrically isolated from one another?
Claim language“is electrically coupled together”
A column decoder outputs distinct control voltages onto each first test line, allowing one column of first switches to open while all other columns remain clamped to the reference voltage. Isolating the first test lines enables column-by-column leakage current profiling and prevents a shorted gate in one column from pulling down the control voltage of neighboring columns. Each driver uses a level-shifting inverter powered between ground and the switch-gate supply.
Section 2 · machine-generated
Variations
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
Other field of use
Battery cell leakage testing in array fixture
Each device under test is a rechargeable lithium-ion pouch cell, and the array is mounted inside an environmental test chamber for high-voltage insulation screening. The series resistor in each test unit circuit limits short-circuit current during separator breakdown so adjacent cells on the shared second test lines remain undisturbed. During stress testing, the first switches connect every intermediate node to a ground reference node while a high-voltage direct-current source biases the coupled second test lines. When a cell develops an internal leakage path, the second switches isolate and route that cell's intermediate node voltage to an external electrometer for per-cell leakage current measurement.
Component substitution
Polysilicon fuse replacing the series current-limiting resistor
A thin-film polysilicon fuse replaces the fixed series resistor between the input terminal and the device under test in each test unit circuit. During normal dielectric stress, the fuse exhibits a low series resistance of less than 50 ohms, applying nearly the full stress voltage from the second test line across the dielectric. When time-dependent dielectric breakdown occurs, the resulting surge current heats and melts the polysilicon filament, permanently opening the current path to the broken-down device. This open circuit prevents voltage droop on the shared second test lines while the first and second switches still allow post-breakdown node interrogation.
Combination with existing systems
Integration with an automated wafer prober station
The measurement circuit is fabricated on a scribe-line test chip and coupled to a motorized wafer prober equipped with a multi-pin probe card and a heated chuck. The probe card routes the coupled first test lines, coupled second test lines, and column output terminals directly to a multi-channel source-measure unit rack. A chuck temperature controller maintains the wafer at 125 degrees Celsius while the source-measure unit applies constant voltage stress and logs output currents across all columns simultaneously. After completing the stress and readout sequence for one die, the prober steps the wafer to the next die site and repeats the measurement.
Specific version of a part
Low-resistance copper column control lines
Each first test line is routed as a 0.5-micrometer-wide copper trace in an intermediate metallization layer, running parallel to the column axis across all rows. The trace connects down through tungsten vias to the polysilicon gate terminals of the first switches in each cell along that column. End-to-end line resistance is kept below 20 ohms so that switching edges propagate uniformly to every row.
Wide aluminum stress-bus column traces
Each second test line is formed as a 4-micrometer-wide aluminum-copper trace in a thick upper metal layer to carry cumulative breakdown currents without electromigration. Redundant dual-via arrays link each trace to the input terminals of the test unit circuits in its column. The wider conductor geometry limits voltage drop across the array to less than 5 millivolts under full stress bias.
Perpendicular metal strap coupling first lines
All first test lines terminate at the edge of the array into a single perpendicular metal bus bar running along the row direction. Dual-layer vias join each column control trace to this shared strap, which routes to a single external bond pad for global gate control. This configuration shorts all first test lines together with less than 2 ohms of inter-column resistance.
Section 3 · quoted from USPTO records
Other work
Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.
1.1an array comprising a plurality of test unit circuits arranged in rows and columns, wherein each of the plurality of test unit circuits comprises: a device under test; a resistor coupled in series with the device under test between an input terminal and an intermediate node; a first switch coupled between the intermediate node and a reference node of a reference voltage; and a second switch coupled between the intermediate node and an output terminal;
Preferably, when the constant voltage is negative, the plurality of test units is a plurality of P-type test units, and the current restraint unit includes a resistor connected to the dielectric test sample; and at least one DEPFET transistor comprising a drain connected to the ground, a source connected to the resistor, a gate connected to the dielectric test sample, and a base connected to the dielectric test sample; wherein a cross voltage of the resistor caused by the bre
B · US 2020/0141995 A1 · ¶ 8
1.2a plurality of first test lines each connected to control terminals of the first switches of the test unit circuits in a corresponding column among the columns of the array; and
For example, the column word line CWL0 is coupled to the control terminals of the 256 switches SW of each column of the memory cells MC of the memory block bk0, the column word line CWL7 is coupled to the control terminals of the 256 switches SW of each column of the memory cells MC of the memory block bk7, and so on.
A · US 2018/0233182 A1 · ¶ 33
1.3a plurality of second test lines each connected to the input terminals of the test unit circuits in the corresponding column among the columns of the array,
1.4wherein
1.5the plurality of first test lines is electrically coupled together, and
1.6the plurality of second test lines is electrically coupled together.
An empty cell means only that no passage was reproduced there.
Why these two documents?
Only Document A has a passage for 1.2. Only Document B has a passage for 1.1.
Additional background
Sentences reproduced word for word from these documents that state a problem, a purpose or benefit, a field of use, or an application or improvement.
The idle bit lines consume power during the read/write operation, such that the memory device 100 of the prior art has higher power consumption.
A · US 2018/0233182 A1 · ¶ 6
However, TDDB test takes a long time for one-by-one test.
B · US 2020/0141995 A1 · ¶ 3
It is therefore an objective of the present invention to provide a time dependent dielectric breakdown test structure and test method thereof, to perform batch test among a plurality of dielectric test samples to save test time.
B · US 2020/0141995 A1 · ¶ 5
Cite aspatent.fyi, US 2026/0367132 A1, claim 1, first published 2026-11-23T05:37:28-05:00, https://patent.fyi/US20260367132/, SHA-256 519fd2a70096cbd7e6cedf3f4aebf74be7fc0d56dd109f43e35bcd348cd8c5c9