1.1Using a regional baseline template
What ifWhat if the borehole selection process starts from a regional geological template rather than receiving input data from a site?
Claim language“receiving input data from a site”
A planning computer loads a precompiled regional stratigraphy grid and generic soil parameter tables indexed by landform class and watershed basin. The grid supplies prior mean values and spatial correlation lengths for shear strength and layer thickness across the target polygon without any site-specific measurements. Initial borehole targets are placed at maximum grid-spacing intervals to collect the first physical samples.
1.2Deterministic spatial interpolation without simulation
What ifWhat if unknown site values are estimated by a deterministic spatial interpolation rather than a geostatistical prediction and simulation?
Claim language“a geostatistical prediction and simulation”
An interpolation engine fits radial basis functions or inverse-distance weights directly through known sample coordinates to produce a single continuous surface for each layer boundary and soil parameter. Local estimation error is approximated from the distance to the nearest three sample points and the local spatial gradient magnitude rather than from stochastic realizations. Areas where the distance-weighted gradient exceeds a threshold receive priority for additional sampling.
What ifWhat if borehole planning omits determining a ground uncertainty and relies solely on geological layer boundary uncertainty?
Claim language“determining a ground uncertainty”
The spatial model computes only the probability of encountering different lithological units at each unsampled grid cell using indicator spatial interpolation on logged stratum contacts. Engineering parameters such as bearing capacity and compressibility are assigned fixed conservative lookup values for each predicted rock or soil class. Borehole locations are selected where lithological class entropy is highest, without modeling within-layer property variance.
1.3Grid spacing driven by structural footprint
What ifWhat if borehole count and placement are set by a fixed geometric grid over the structural footprint rather than based on the geological uncertainty and the ground uncertainty?
Claim language“based on the geological uncertainty and the ground uncertainty”
A layout generator overlays a regular triangular or square mesh across the building footprint and foundation perimeter using a fixed center-to-center spacing parameter, such as 25 meters. Extra borehole nodes are snapped directly to high-load column footings and retaining wall corners from a digital structural layout drawing. The resulting borehole coordinates are exported directly to the field crew without consulting any uncertainty map.
1.4Non-invasive surface geophysical profiling
What ifWhat if subsurface properties at the target locations are measured using surface geophysical arrays rather than drilling a borehole?
Claim language“drilling a borehole”
Field technicians deploy linear arrays of seismic geophones and stainless-steel ground electrodes across the selected coordinates at two-meter station intervals. A mechanical drop-weight source generates surface shear waves while an impedance meter injects low-frequency electrical current to record apparent resistivity and wave velocity profiles. Inversion software converts the arrival-time and potential-difference datasets into depth sections of stiffness and moisture content without penetrating the ground.
Section 2 · machine-generated
Variations
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
Other field of use
Subsea mineral exploration borehole placement planning
A marine survey system collects bathymetric sonar backscatter, sub-bottom acoustic profiler traces, and existing gravity core logs across a seafloor exploration block. A geostatistical simulation processor maps these inputs onto a three-dimensional marine grid to compute the spatial uncertainty of seafloor sediment lithology and undrained shear strength at unsampled coordinates. A planning module calculates the number and coordinates of seabed sampling locations where the combined lithological and shear strength variance exceeds a preset threshold. An autonomous seabed drill rig deployed from a surface vessel executes vibracore or rotary coring at the calculated coordinates.
Contaminated aquifer remediation well placement planning
An environmental monitoring system collects soil vapor readings, groundwater contaminant concentrations, and hydraulic conductivity values from existing monitoring wells at a remediation site. A geostatistical processor simulates the spatial distribution of permeable sand lenses and low-permeability clay aquitards alongside contaminant concentration uncertainty across a three-dimensional subsurface grid. A well-placement optimizer determines the count and coordinates of additional boreholes required to bound the contaminant plume within a target confidence interval. A direct-push drill rig advances sampling boreholes and installs piezometers at the computed coordinates.
Component substitution
Indicator variogram and normal-score simulation modeling
A data ingestion module receives borehole lithology logs and laboratory shear strength measurements indexed by three-dimensional spatial coordinates. An indicator variogram estimator converts discrete geological classes into binary indicator variables and runs sequential indicator simulation to generate equiprobable lithology realizations across the site grid. A normal-score simulator models continuous ground property distributions conditioned on both the measured sample values and the simulated lithology boundaries. A borehole planner aggregates realization variance across both simulation outputs to select infill drilling coordinates where joint uncertainty is highest.
Parameter or scale variation
High-resolution urban foundation grid spacing
A geostatistical engine discretizes a 100-meter by 100-meter urban building footprint to a depth of 30 meters using voxel cells measuring 0.5 meters horizontally and 0.25 meters vertically. Input data from initial cone penetration tests and rotary borings are interpolated over anisotropic search radii ranging from 5 meters to 40 meters. A planner identifies sub-volumes where the coefficient of variation of bearing capacity exceeds 10 percent and assigns between 4 and 12 additional borehole coordinates spaced 5 meters to 15 meters apart. A truck-mounted rotary drill rig advances 100-millimeter diameter boreholes at the assigned coordinates to verify load-bearing strata.
Combination with existing systems
Integration with measurement-while-drilling telemetry systems
A rotary drill rig equipped with torque, thrust, rotation speed, and penetration rate sensors streams mechanical specific energy telemetry over a wireless field link to a central geostatistical server during borehole advancement. The server converts the incoming telemetry profiles into estimated rock strength and lithology updates at 0.1-meter depth intervals. After each borehole finishes, the simulation engine recomputes the random field uncertainty across all remaining unsampled grid cells and updates the remaining borehole count and coordinates. The updated drilling schedule transmits directly to the rig operator display to direct the rig to the next highest-uncertainty location.
A trained probabilistic neural network ingests spatial coordinates, surface electrical resistivity measurements, and existing borehole logs to output posterior probability distributions for rock type and uniaxial compressive strength at every unsampled grid node. An automated acquisition module evaluates an expected information gain function across the joint posterior distributions to rank candidate drilling coordinates. When the maximum joint variance exceeds a configured limit, control software dispatches the top-ranked coordinates to an autonomous tracked drill rig via a serial control interface. Newly logged core data feeds back into the model inference pipeline to update predictions for subsequent boreholes without manual intervention.
Specific version of a part
Multisource borehole and cone sounding ingestion
A data ingestion parser reads tabular logs from prior rotary borings, piezocone tip-resistance profiles, and laboratory triaxial shear test records into a unified spatial database. Each record is tagged with three-dimensional survey coordinates, elevation datum, and measurement sensor precision weights. Outlier filtering removes readings exceeding three standard deviations from local stratum medians before model fitting.
Normal-score and indicator co-simulation
A geostatistical engine partitions the site volume into a regular three-dimensional voxel grid and fits empirical variograms along vertical and horizontal axes. Indicator co-simulation generates 100 equiprobable realizations of lithological unit boundaries, while normal-score sequential simulation models continuous shear-wave velocity and void ratio within each unit. Cell-by-cell classification entropy and interquartile range across the realizations quantify geological uncertainty and ground uncertainty respectively.
An optimization solver evaluates candidate borehole coordinates on the simulation grid by computing the expected reduction in integrated posterior variance per meter of drilling. Starting from zero new holes, a greedy selection loop adds one borehole at the coordinate maximizing the weighted sum of geological and ground uncertainty reduction, then updates the conditional variance field. The loop terminates when total residual uncertainty drops below a target threshold or a maximum borehole count budget is reached.
Rotary hollow-stem auger with split-spoon sampling
A track-mounted hydraulic drill rig navigates to each selected coordinate using differential satellite positioning and advances a 108-millimeter hollow-stem auger to target strata depths. At 1.5-meter depth intervals, a 63.5-kilogram drop hammer drives a split-barrel sampler 450 millimeters into undisturbed soil to record blow counts and recover core specimens. Recovered samples are sealed in moisture-tight liners and logged for grain size, plasticity, and liquid limit indices.
Section 3 · quoted from USPTO records
Other work
Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.
1.1receiving input data from a site, the input data comprising a known geological property, a known ground property, or combinations thereof,
The system obtains data associated with a geological state of a geological entity, such as, for example, hydrocarbon deposit. Examples of a geological state of a geological entity include, but are not limited to the age of the geological entity, the material properties of the geological entity, the period of time the geological entity was deposited on another geological entity, as well as other quantifiable natures of the geological entity.
B · US 2020/0174158 A1 · ¶ 16
1.2generating a geostatistical prediction and simulation on a random field based on the input data, the generating the geostatistical prediction and simulation on the random field based on the input data comprising: determining a geological uncertainty of an unknown geological property at an unsampled spatial location of the random field; and determining a ground uncertainty of an unknown ground property at the unsampled spatial location (s0) of the random field;
These random vector variables are typically only known with any confidence at well locations of the subterranean zone of interest. In an exemplary embodiment, to propagate these variables away from known locations to unknown locations, the geostatistical equations (24), (25), and (26), as described below, can be used.
A · US 2010/0121623 A1 · ¶ 60
1.3determining an estimated number of one or more boreholes, an estimated location of one or more boreholes, or combinations thereof, based on the geological uncertainty and the ground uncertainty; and
1.4drilling a borehole based on the estimated number of the one or more boreholes, the estimated location of the one or more boreholes, or combinations thereof.
An empty cell means only that no passage was reproduced there.
Why these two documents?
Only Document A has a passage for 1.2. Only Document B has a passage for 1.1.
Additional background
Sentences reproduced word for word from these documents that state a problem, a purpose or benefit, a field of use, or an application or improvement.
Embodiments of the present disclosure generally relate to the fields of geology, geophysics, and geomechanics.
A · US 2010/0121623 A1 · ¶ 3
Related claim parts: 1.1
There is a need, therefore, for a geostatistical method for building a geomechanical model in anisotropic and heterogeneous complex media.
A · US 2010/0121623 A1 · ¶ 9
There is also a need to apply the geomechanical model to predict the appropriate wellbore operational parameters required to maintain borehole stability in such environments during different operational phases.
A · US 2010/0121623 A1 · ¶ 9
Further, Geoscientists sometimes make different geological observations of geological data at a particular time, which further complicates the process to assess the geological data.