patent.fyi
Applications  /  US 2026/0367586
United States Patent Application Publication

US 2026/0367586 A1

Published
Nov 19, 2026
Filed
Dec 6, 2023
Earliest date on the face
Dec 7, 2022
Classification
G05B 13/0265
First published here
Nov 23, 2026

Generated automatically. Not reviewed by a person. Not legal advice or an opinion.

Section 1 · machine-generated

What if?

Questions about how individual parts of claim 1 might be changed. A question may describe something different from what the claim language recites, or a version of it; no view is offered on which.

1.1Local controller processes status information

What ifWhat if the status information is received by a local embedded controller co-located with the battery racks?
Claim language“by a remote computer system”

An embedded microprocessor inside the battery enclosure reads cell voltage, pack temperature, and inverter current directly over a serial field bus. The local controller buffers these readings in volatile memory and executes control computations on site without transmitting telemetry over an external network.

1.1External grid measurements drive control

What ifWhat if the remote computer system receives external grid frequency and ambient weather forecasts without receiving internal operating parameters of the storage components?
Claim language“operating parameters of components”

A network interface at the remote computer system ingests utility substation frequency measurements, wholesale electricity price signals, and solar irradiance forecasts from external feeds. The remote system infers charge and discharge targets from grid demand and weather conditions while a local battery management circuit independently enforces hardware safety limits.

1.1Local controller receives status data

What ifWhat if status information is received by an on-site embedded controller rather than a remote computer system?
Claim language“by a remote computer system”

A local microcontroller mounted inside the battery enclosure collects cell voltage, module temperature, and bus current directly over an isolated serial bus. The local unit processes these measurements at sub-second intervals without transmitting telemetry over an external wide-area network.

1.1External grid signals drive control

What ifWhat if the computer system receives external grid frequency and ambient weather forecasts rather than operating parameters of components?
Claim language“operating parameters of components”

The remote computer system ingests utility frequency deviation, wholesale electricity price signals, and solar irradiance forecasts from external telemetry feeds. Control schedules for charging and discharging are computed from these external boundary conditions while an internal battery management circuit independently enforces hardware safety limits.

1.4Local system polls published parameters

What ifWhat if the remote computer system stores the updated control parameter in a shared repository without sending an instruction to apply it?
Claim language“an instruction to apply”

The remote computer system writes the calculated setpoint values to an authenticated configuration table on a network server. At each control cycle, the local energy management controller queries the table, validates the parameter bounds against local cell limits, and decides independently whether to load the new values.

Section 2 · machine-generated

Variations

Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.

Component substitution

Reinforcement learning policy replacing supervised control models

A deep reinforcement learning agent replaces a supervised machine learning model on the remote computer system to generate sequential control parameters. A state-encoder module converts incoming battery pack telemetry, including internal resistance estimates and ambient temperature, into a fixed-length state vector. The policy network outputs continuous action values representing charge current limits and cell-balancing thresholds, which are evaluated against a reward function that penalizes capacity fade and energy loss. The remote system transmits the resulting control parameters and an apply instruction to the local battery management unit.

Gradient-boosted decision trees for control parameter generation

An ensemble of gradient-boosted decision trees substitutes for a neural network inside the remote computer system to generate battery control parameters from tabular operating telemetry. Input features derived from string voltages, module temperatures, and cumulative ampere-hour throughput pass through shallow decision trees trained to map operating states to optimal charge-voltage ceilings and cooling fan speeds. Because tree inference requires deterministic memory and low compute latency, the remote system evaluates candidate parameter sets across multiple operating scenarios within milliseconds. The selected control parameters and an apply instruction are then transmitted to the energy storage controller over an encrypted network socket.

Parameter or scale variation

Sub-second telemetry sampling across multi-megawatt modular arrays

An energy storage installation comprising 24 parallel battery containers rated at 5 megawatts total capacity transmits status packets every 200 milliseconds instead of at multi-minute intervals. Each container controller aggregates readings from 16 series-connected modules operating between 800 volts and 1,500 volts direct current. The remote computer system processes the high-rate stream in sliding 10-second windows and issues updated current-derating parameters when cell temperature differentials exceed 4 degrees Celsius. The local controllers apply the updated derating curves within one control cycle to prevent localized thermal runaway.

Automated or data-driven variant

Automated event-triggered telemetry and closed-loop parameter tuning

Local edge sensors monitor cell voltage ripple and acoustic emission signals to trigger asynchronous status transmissions to the remote computer system whenever measured values cross dynamic thresholds. Upon receiving an event-triggered packet, an automated feature-extraction pipeline computes impedance spectra and feeds them into an online adaptive model that updates state-estimation gains and charge-termination voltages. A validation module checks the generated parameters against hardware safety bounds before dispatching them with an apply command to the local controller. Subsequent telemetry confirms parameter convergence, and the model weights update automatically from the observed response error.

Specific version of a part

Diagnostic health scores replace control parameters

The model outputs a numerical degradation index and a thermal stress forecast for each battery module. A downstream deterministic rule engine maps those health indicators to specific charge-rate derating factors and cooling fan duty cycles.

Telemetry gateway aggregates cell sensor data

A site gateway polls battery management circuits over an isolated serial bus every five seconds to collect individual cell voltages, module thermistor readings, and inverter DC-link currents. The gateway serializes these values into compressed binary frames and transmits them over an encrypted cellular or fiber-optic link to a remote server.

Models output load demand forecasts

The model generates a time series of predicted kilowatt load and photovoltaic generation values for the next four hours. A separate rule-based dispatch engine converts those forecasts into inverter current limits and state-of-charge targets using fixed efficiency curves.

Telemetry gateway over cellular packet link

A ruggedized industrial gateway connected to the battery management bus samples cell-string voltages, coolant inlet temperatures, and bidirectional inverter currents every five seconds. The gateway buffers readings in non-volatile flash memory and transmits compressed telemetry packets over an encrypted cellular data link to a remote ingestion endpoint.

Gradient-boosted trees with rolling window

The remote server executes an ensemble of gradient-boosted decision trees trained on historical charge-discharge cycles, ambient temperatures, and internal impedance growth. Before inference, a preprocessing pipeline normalizes incoming voltage and thermal arrays across a sliding twenty-four-hour window.

Bounded charging rate and thermal target

The model outputs a maximum continuous charge rate between 0.2C and 1.0C along with a target liquid-coolant valve opening percentage. Output values pass through a clamping filter that restricts parameters to rated safe operating bounds before transmission.

Section 3 · quoted from USPTO records

Other work

Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.

Document AUS 6,940,421 B2
Published
Sep 6, 2005
Filed
Dec 5, 2000
Document BUS 7,066,010 B2
Published
Jun 27, 2006
Filed
May 11, 2004
Class
G01M 3/02
Claim 1
Document A
Document B
1.1receiving, by a remote computer system, status information comprising or indicative of operating parameters of components of the energy storage system;
A dual communication channel remote telemetry system comprising: at least one central controller configured to generate at least one control message and to receive at least one reporting message, said at least one central controller further configured to access a broadcast communications channel for carrying said control message, and to access a shared two-way communications channel for receiving said reporting message; a plurality of remote telemetry units configured to meas
A · US 6,940,421 B2 · claim 7
1.2providing, by the remote computer system, the status information to one or more machine learning models trained to generate control parameters for the components of the energy system based on the status information;
1.3receiving, as outputs of the one or more machine learning models, an updated control parameter for at least one component of the energy storage system; and
1.4providing, by the remote computer system and to the energy storage system, the updated control parameter and an instruction to apply the updated control parameter to the components of the energy storage system.
The central controller is configured to utilize a conventional broadcast communications channel to transmit commands to individual remote telemetry units, each of which is assigned a unique identification code. Signals broadcast from the central controller are received at receivers associated with each remote telemetry unit, which performs a directed operation if a unique identification code included in the broadcast signal matches the identification code assigned to the remote telemetry unit.
A · US 6,940,421 B2 · abstract
Further, the mobile station 80 may remotely control the operation of the RTU 82 by sending control signals from the transmitter-receiver 66 and to the radio module 88 of the RTU 82, either directly or via one or more of the RTUs 22 and/or the repeater 24. In a similar manner, the mobile station 80 may remotely control the operation of any portion of the pressure system 14 that is controlled by the conventional control components connected to the data acquisition unit 84.
B · US 7,066,010 B2 · ¶ 36

An empty cell means only that no passage was reproduced there.

Why these two documents?

Only Document A has a passage for 1.1. Both have a passage for 1.4.

Additional background

Sentences reproduced word for word from these documents that state a problem, a purpose or benefit, a field of use, or an application or improvement.

Further, test personnel are usually required to be in close proximity to the pipeline at various locations along the pipeline in order to record measurement readings.
B · US 7,066,010 B2 · ¶ 4

Related claim parts: 1.1

In addition to the time and cost increases associated with stationing personnel along the pipeline, this arrangement also creates a safety hazard in that the pipeline could structurally fail at any location during the test, possibly injuring any nearby test personnel.
B · US 7,066,010 B2 · ¶ 4

Related claim parts: 1.1

A high financial cost is associated with dedicated telephone lines due to regulations limiting the routing of the phone lines, as well as regulations controlling the cost to the consumer.
A · US 6,940,421 B2 · ¶ 4
Briefly stated, the present invention is a novel and improved remote telemetry system which uses low-cost remote communications devices operating on existing wire-based communications systems, wireless communications systems, and/or a combination thereof in order to provide real-time reading and control of remote telemetry units.
A · US 6,940,421 B2 · ¶ 7
Therefore, what is needed is a hydrostatic test system and method that overcomes the above-described problems, among others.
B · US 7,066,010 B2 · ¶ 5
Cite aspatent.fyi, US 2026/0367586 A1, claim 1, first published 2026-11-23T20:11:03-05:00, https://patent.fyi/US20260367586/, SHA-256 0ed23670f7f837277be7f5042c873fdb47f7873b2d5d09e53e602f48dbb9a767
First published
Permanent addresshttps://patent.fyi/US20260367586/
Content fingerprint (SHA-256)0ed23670f7f837277be7f5042c873fdb47f7873b2d5d09e53e602f48dbb9a767
Methodv2026-11-18.2 · automated, not reviewed by a person
Correctionscorrections@patent.fyi