1.1Static port profile replaces power negotiation
What ifWhat if the initial power budget is loaded from a static port profile in memory without performing a power negotiation?
Claim language“performing a power negotiation”
A configuration table in the power sourcing equipment controller stores a fixed wattage limit for each physical network port. Upon detecting a connected load via a direct-current signature resistance check, the controller applies the stored wattage limit directly as the initial power budget without exchanging packet-based power messages. The powered device draws power up to that fixed port limit and regulates its internal subsystems based on measured input voltage.
1.2Local capacitor supplies unbudgeted startup power
What ifWhat if the powered device draws startup energy from an onboard supercapacitor while bypassing operation within the initial power budget?
Claim language“within the initial power budget”
A pre-charged supercapacitor bank on the powered device mainboard supplies high-current boot loads during initialization while the network port draws only a minimal trickle current. Once the boot sequence finishes and the efficiency ratio is established, a solid-state switch disconnects the supercapacitor discharge path and transitions the device to normal line-powered operation. This decouples peak initialization current from the initial port allocation.
1.3Inline cabling sensor measures supplied power
What ifWhat if an inline sensor module in the cabling path measures the supplied power outside the power sourcing equipment?
Claim language“at the power sourcing equipment”
A passive current-sense resistor and voltage divider sit inside a wall jack or patch-panel coupler between the switch port and the powered device. An integrated microcontroller samples the voltage drop across the sense resistor and transmits the computed wattage over data-link frames. The efficiency calculation engine receives this external measurement to compare against the powered device consumption.
1.4Operating-state table replaces actual power measurement
What ifWhat if the powered device estimates its load from an operating-state lookup table without measuring actual power consumption?
Claim language“actual power consumption”
Firmware on the powered device tracks active hardware states such as processor clock speed, radio amplifier gain, and display backlight duty cycle. A software routine sums the pre-characterized nominal wattage for each active state from a read-only table in nonvolatile memory. The device reports this summed nominal figure to the budget controller, operating without an onboard analog-to-digital power meter.
1.5Absolute wattage loss replaces efficiency ratio
What ifWhat if the system computes an absolute wattage loss difference between the two power readings without calculating a power efficiency ratio?
Claim language“calculating a power efficiency ratio”
A subtraction unit subtracts the powered device consumption from the power sourcing equipment output power to obtain a scalar loss value in watts. The controller adds this measured loss value directly to the powered device target load to set the adjusted power budget. Using an additive wattage offset keeps the budget calculation linear when cable resistive losses vary independently of converter efficiency.
Section 2 · machine-generated
Variations
Further arrangements of the same subject matter, described here as of the publication date at the foot of this page.
Other field of use
Agricultural greenhouse sensor and actuator power scaling
In a controlled-environment greenhouse, a central power sourcing controller supplies direct current over twisted-pair cabling to distributed environmental node assemblies located across planting bays. Each node assembly includes a microcontroller, soil moisture probes, spectral light sensors, and motorized vent actuators powered through a local buck converter. After an initial power negotiation reserves headroom for long cable runs and converter heat dissipation, the central controller measures port output power via a shunt resistor while each node samples its regulated rail voltage and load current. The node computes the efficiency ratio from both measurements and scales its budget upward or downward to permit higher-duty actuator cycles or additional sensor polling without exceeding cable thermal limits.
Component substitution
Hall-effect current sensing with recursive state filtering
In place of resistive shunt measurement at the power sourcing port and the powered device input, both endpoints use isolated Hall-effect current transducers paired with analog-to-digital converters. A discrete-time recursive state filter running on the powered device microcontroller processes the noisy voltage and current samples from both endpoints to estimate true input power and conversion efficiency. The filter suppresses transient switching spikes from inductive loads such as pan-tilt motors or cooling fans before computing the power efficiency ratio. The resulting smoothed ratio scales the initial power budget to produce a stable adjusted power budget that prevents rapid oscillation in device operating modes.
Auxiliary phantom-pair telemetry for power budget updates
Instead of exchanging power measurements over in-band packet data frames, the power sourcing equipment and the powered device communicate measurement telemetry through a dedicated low-speed auxiliary channel modulated over the phantom power pair. Each endpoint includes a differential line driver and an optically isolated receiver that transfers 16-bit integer values representing milliwatts every 100 milliseconds. Separating power telemetry from the main packet switching fabric ensures that network congestion or packet drops do not delay calculation of the power efficiency ratio. The local power management integrated circuit uses the received port power value directly in hardware registers to clamp or expand the adjusted power budget.
Parameter or scale variation
Multi-tier cable resistance and high-wattage scaling
A high-power distribution switch supplies between 60 watts and 90 watts per port over four-pair twisted-pair runs ranging from 10 meters to 100 meters in length, where conductor resistance varies between 1.5 ohms and 18 ohms. During startup, the initial power budget assumes a worst-case 20 percent transmission and conversion loss, capping usable device load at 72 watts on a 90-watt port. Every 5 seconds during steady operation, the switch reports port output power with 0.1-watt resolution, and the powered device compares that value against its internal DC-DC converter output to compute an efficiency ratio between 0.78 and 0.96. When measured efficiency on a 15-meter run reaches 0.94, the device scales its initial 72-watt budget to 84.6 watts to power auxiliary radio transceivers.
Combination with existing systems
Integration with building heating and lighting controllers
A powered luminaire and occupancy sensor unit connects to a network switch port and exchanges telemetry with a building automation gateway over a packet-based control bus. The gateway aggregates the calculated power efficiency ratios and adjusted power budgets from all powered luminaires on a floor alongside ambient temperature readings from wall thermostats. When a luminaire operates at high conversion efficiency and receives an expanded adjusted power budget, the gateway directs surplus electrical capacity toward localized air-damper actuators or dimming ballasts without requesting additional feeder circuits. If efficiency drops due to aging power supplies or elevated ceiling plenum temperatures, the gateway throttles non-critical lighting zones and flags the affected port for maintenance.
Automated or data-driven variant
Machine learning efficiency prediction for dynamic loads
A lightweight regression model deployed on the powered device microcontroller ingests historical pairs of sourcing-port output power, device-side consumption, internal board temperature, and active workload state. Rather than waiting for steady-state averaging, the model predicts the power efficiency ratio for an upcoming workload transition, such as activating an infrared illuminator array or a neural inference accelerator. The microcontroller scales the initial power budget using the predicted efficiency ratio before the load step occurs and then verifies the prediction against real-time current measurements from both ends. Any residual error between predicted and measured efficiency updates the model weights online via recursive least squares.
Specific version of a part
Link-layer frame negotiation with class resistance
The power sourcing equipment applies a probing voltage between 15.5 volts and 20.5 volts to read a precision metal-film classification resistor at the powered device front end. After link-up, both devices exchange data-link layer discovery frames carrying type-length-value fields to refine the initial power budget in 0.1-watt increments. The initial budget includes a fixed 15 percent margin for twisted-pair cable resistance and DC-DC converter losses.
Low-side shunt resistor with differential amplifier
A 0.05-ohm manganese-copper alloy shunt resistor is placed in the return path of each power sourcing equipment port. A high-common-mode differential amplifier measures the voltage drop across the shunt, and a 12-bit analog-to-digital converter samples both port voltage and current at 1 kilohertz. The port controller multiplies these digital samples to compute real-time output power in milliwatts.
Hall-effect current sensor at converter output
An integrated Hall-effect current sensor sits on the secondary side of the powered device isolated flyback DC-DC converter. A microcontroller samples the sensor output voltage alongside a resistive voltage divider on the regulated 12-volt rail every 100 milliseconds. Multiplying the regulated rail voltage and load current yields the actual power consumption downstream of all rectification and conversion stages.
Dynamic processor throttling within adjusted budget
The powered device firmware maps the adjusted power budget to a maximum duty-cycle cap for its pulse-width-modulated peripheral drivers and processor clock states. When total system load reaches within 5 percent of the adjusted power budget, a hardware comparator triggers a clock-gating interrupt to shed non-critical auxiliary loads. Simultaneously, the power sourcing equipment updates its digital-to-analog current-limit reference to match the adjusted budget.
Section 3 · quoted from USPTO records
Other work
Passages reproduced word for word from two earlier-published U.S. patent documents, placed beside the language of claim 1. No characterization is offered. Each passage is marked A or B for the document it comes from; ¶ numbers are the paragraph numbers in the USPTO’s published full text of that document.
1.1performing a power negotiation between the power sourcing equipment and the powered device to determine an initial power budget, wherein the initial power budget accounts for assumed transmission and/or conversion losses between the power sourcing equipment and the powered device;
With the maximum power rating known, management processor 330 then asks permission from the enclosure manager 111 (or other managers higher up the hierarchical chain) to startup server 302 per block 351. The enclosure manager 111 then determines whether allowing server 302 to startup will cause the enclosure manager 111 to exceed its power budget in block 352.
A · US 2007/0300083 A1 · ¶ 47
1.2drawing power from the power sourcing equipment to the powered device within the initial power budget;
As discussed above, each server in the data center may be required to limit its power consumption to within a power budget value assigned by a management device higher up in the hierarchy.
A · US 2007/0300083 A1 · ¶ 74
1.3measuring, at the power sourcing equipment, output power supplied to the powered device;
In particular, LAN 292 conveys individual power consumptions of the servers 211 through 213 and 261 through 264, as measured by the rack PDUs, to power monitoring appliances 221 and 271.
B · US 11,221,662 B1 · ¶ 46
1.4measuring, at the powered device, actual power consumption in the powered device;
During this synthetic work load test, non-volatile storage 311 may execute code that reads the actual power consumption as measured by measurement circuitry 404 (shown in FIG. 4A).
A · US 2007/0300083 A1 · ¶ 70
1.5calculating a power efficiency ratio between the output power and the actual power consumption;
1.6setting an adjusted power budget for the powered device by scaling the initial power budget using the power efficiency ratio; and
A need further exists to easily adjust budgeted power for all items in the data center so that budgeted power and actual power align such that the data center manager know with precision how much excess capacity exists.
B · US 11,221,662 B1 · ¶ 12
1.7drawing power from the power sourcing equipment to the powered device within the adjusted power budget.
An empty cell means only that no passage was reproduced there.
Why these two documents?
Only Document A has a passage for 1.11.21.4. Only Document B has a passage for 1.31.6. Both are classified in CPC G06F, as is this patent.
Additional background
Sentences reproduced word for word from these documents that state a problem, a purpose or benefit, a field of use, or an application or improvement.
De-rating, however, may still undesirably mis-predict actual power consumption.
A · US 2007/0300083 A1 · ¶ 3
Related claim parts: 1.31.6
The present invention relates generally to the field of data center infrastructure management (DCIM) and more particularly to the field of budgeting power capacity for data center equipment.
B · US 11,221,662 B1 · ¶ 2
Related claim parts: 1.11.21.4
However, an unexpected change in computing demand, for example as a result of a work load shift between servers, may increase power demand and trip a circuit breaker or cause localized over-heating.
A · US 2007/0300083 A1 · ¶ 3
Data center managers require tools that provide resiliency, improve uptime, and reduce risk across the data center infrastructure—including network, power, IT equipment, applications software, and applications services.
B · US 11,221,662 B1 · ¶ 8
Data Center Infrastructure Management (DCIM) tools dramatically simplify data center management by giving data center operators the ability to run efficient data center operations and improve data center infrastructure planning and design.
B · US 11,221,662 B1 · ¶ 8